Adjacent rooms with chemicals

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Mike Fortier  on 

Hello, We have two chemical storage rooms that are adjacent to one another and share a common wall. Each of these spaces will have its own exhaust.

2
Sustainability Coordinator
Jacobs Engineering
LEEDuser Premium Member
2 thumbs up
Fri Sep 23, 2016, 2:37 pm

delivery entrance in a shopping mall

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Agnieszka Rylska  on 

We are working on a project of a shopping mall. The building has a few delivery entrances (on the ground level and underground level) next to the delivery docks.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Sep 9, 2016, 9:29 am

dedicated exhaust

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Agnieszka Rylska  on 

I would like to make sure what does "dedicated/designated exhaust" mean.

5
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Mon Jul 25, 2016, 8:14 pm

Measuring walking distance in L-shaped vestibule

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Lyle Axelarris  on 

The vestibule is actually rectangular, but the exterior door is 90 degrees off of the interior door, so the walking path is not straight.

5
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up
Thu Jul 21, 2016, 8:04 pm

LPE Option

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Logan Dorrell  on 

Where is the form for the LPE (Licensed Professional Exemption) to fill out and submit for NC 2009?

2
Sat Jun 18, 2016, 5:57 pm

n/a

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Anastasia Makarenko  on 

Dear all, does anybody know if we should consider microbiology laboratory premises as a pollutant source for this credit?

3
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Wed May 4, 2016, 4:44 pm

Residential Requirements

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Brightworks Sustainability  on 

Hi all, I am working on a graduate housing project that is all residential, and some apartments have doors directly to the outdoors. What are the walk-off mat alternate requirements in this case?

2
Wed Apr 20, 2016, 3:01 pm

IEQ Credit 5 - Supply Air Recirculation

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Raj G  on 

In our project, we have a janitor room adjacent to a toilet and these both rooms have exhaust duct which are combined together & exhausted directly to outside without re circulation. But, we h

2
Sat Apr 9, 2016, 9:01 pm

Entryway systems length - Why 10 Feet not 9?

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Ahmed Mosa  on 

Why Entryway systems are at least 10 feet not 9 or 8?

4
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Feb 4, 2016, 6:06 am

Open Air Lobby/Drop off

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  John Covello  on 

Hello, I am working on a project in SE Asia. As with many resorts in SE Asia the lobby is sheltered but open to the exterior of the building.

5
Tue Nov 17, 2015, 11:26 pm