Swimming pool Amenity facility
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Lilian Seow on
There's a swimming pool located in the lobby area as part of the amenity facilities for a multi-residential building. Is this a required area for IAQ c3.2 [flushout or air test] ?
Flush Out using exhaust fans / natural ventilation
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Maya Karkour on
Dear All, Our project is aiming for the Flush-out option of this credit. 1) For the car parking (on the Ground Level), the air is exhausted by dedicated exhaust fans as per ASHRAE 62.1.
Flush out in climate zone 1
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Adi Negara, LEED AP BD+C on
Hi, does anyone here have ever implement flush out in a tropical climate area (climate zone 1 --> high temperature and humidity) and succeed obtaining this credit point?
4 PCH Testing and SBR Verification
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Tom Nichols on
Can anyone assist with the 4-PCH IAQ testing exclusion? We are having difficulty verifying that all flooring products do not contain SBR.
Flush Out Challenges
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Jamie Abernethy on
We had enough time (14days) built into the schedule to do a pre-occupancy flushout.
IAQ Testing - no lab
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by MARIO DE JESUS CARMONA VINAS on
I have a project that will be conducting the Air Quality Testing.
Multi Unit Residential Building - Phased Occupancy
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Erin Norton on
I understand that in order to obtain this credit, 10% of the first 100 dwelling units and 5% of any additional units of the multi-unit residential building must be tested for the specified LEED par
Outdoor Air Contamination
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Norma Lehman on
We have a project that has failed an IAQ test by exceeding TVOC levels.
IAQ Testing method
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Adi Negara, LEED AP BD+C on
It's clear that for this credit, LEED only accepted IAQ testing using EPA or ISO method.
Can credit 3.2 be earned from a re-test post occupancy?
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Robert Mulcahy on
I just completed an IAQ assessment for credit 3.2. Unfortunately, the building failed with excessive levels of particles and VOCs.