IAQ Testing - Maximum Concentrations

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Donald Green  on 

Can anyone tell me where the Maximum Concentrations listed in the reference guide came from? Who established them, is there a document or website that can be visited? Thank you,

4
Mon May 5, 2014, 7:49 pm

IEQc3.2 Option 2: Air Testing

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Christopher Strunk  on 

Currently doing a LEED v.2009 project and are looking to pursue IEQc3.2, Option 2. We got a question from the air quality tester asking about the specific requirements for testing.

2
Default Avatar
LEED AP (O+M)
4 Elements Group
LEEDuser Basic Member
34 thumbs up
Tue Apr 29, 2014, 7:11 pm

Do all units have to run at 100% OA for this credit?

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Saju Varghese  on 

We have 4 A/C Units providing air conditioning to a building, two of them are 100% OA units and two of them are providing the total air supply cfm (OA + recirulated air) is 7000 cfm and 8600 respec

4
Mon Apr 21, 2014, 9:40 pm
8
Wed Apr 16, 2014, 6:26 am

Option 2 fails TVOC - will Retest Pass?

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Sandi Carney  on 

I was the responsible party who ran the baseline IAQ testing event a a newly constructed 6,000 SF teaching facility. The TVOC results came back yesterday and were 4,900 ug/m3.

6
Wed Mar 12, 2014, 4:11 pm

Air Sampling

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Farah A.  on 

If a building is 25,000 sq feet, does that mean only one air sample needs to be taken? Or is it more dependant upon the number of HVAC systems/building area?

7
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 5, 2014, 12:02 pm

Definition contiguous floor area

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Lise Dannesboe  on 

Hi! I was wondering how to interpret the term "contiguous floor area" in IEQ CREDIT 3.2 Option 2 Air Testing.

5
Sustainability Manager
COWI
LEEDuser Premium Member
54 thumbs up
Thu Feb 13, 2014, 4:12 pm

Flush out and data center

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Lise Dannesboe  on 

We are pursuing option 1 Flush Out. Our building includes a large datacenter.

6
Default Avatar
Principal
LSDesignworks @ Vancouver, BC Canada
LEEDuser Basic Member
9 thumbs up
Fri Dec 27, 2013, 3:54 pm

Flush out in a Warehouse

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Paula Hernandez  on 

Hello to everyboty and Merry Christmas, I have to make the flush out in a building which is mostly a Warehouse, that will be regularly occupied, with mechanical ventilation but no air conditioning.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Dec 26, 2013, 5:52 pm

air testing in a mechanical room??

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Carrie Laurendine  on 

1) Do mechanical rooms need air quality testing? 2) There is an air handler unit that supplies air to multiple floors.

2
Mon Nov 18, 2013, 11:00 pm