Moisture absorption narrative

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Heather Holdridge  on 

Would anyone be willing to share the narrative they wrote for the description of methods by which absorptive materials were protected from moisture damage?

3
Mon Sep 15, 2014, 11:24 am
6
Sustainability Director
Lake|Flato Architects
LEEDuser Basic Member
78 thumbs up
Thu Aug 28, 2014, 6:19 pm

EQc3, EQc5 and filtration requirements

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Steve Loppnow  on 

I'd like to confirm that if a project is pursuing EQc5, that they must use MERV 13 filters for flush-out but can still use MERV 8 filters on equipment that is operated during construction.

3
Thu Jun 5, 2014, 2:55 pm

Building Space Flushout

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Weld Morse  on 

I am working on a Massachusetts public works maintenance facility. it involves 2 separate structures; an office building and a garage.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Wed Feb 5, 2014, 10:20 pm

On-site duct manufacture

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Mauricio Ramirez  on 

Hi. One of the projects in which I'm involved will have on-site HVAC duct manufacture. Does this practice has any inconvenient for the compliance with the credit IEQc3.1?

3
Wed Feb 5, 2014, 5:56 pm

EQc3, EQc5 and filtration requirements

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Steve Loppnow  on 

I'd like to confirm that if a project is pursuing EQc5, that they must use MERV 13 filters for flush-out but can still use MERV 8 filters on equipment that is operated during construction.

7
Default Avatar
Systems Director
HOLOS
LEEDuser Basic Member
15 thumbs up
Sat Jan 25, 2014, 2:30 am

date of occupancy on the LEED Online Template

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Benjie Herrera  on 

Just want to inquire what is an OCCUPANCY DATE in the LEED on line template?

4
Thu Jul 25, 2013, 7:09 pm

Filtration during construction ( MERV 8)

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Sharon Morris  on 

I am currently working on a project that has a dual HVAC system. A Daikin mini split ductless system and a DOAS Desert Eir system with ducts & filtration.

3
Tue Mar 5, 2013, 4:59 pm

MERV-8 Filtration

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Marcia Weekes  on 

I was under the impression that every LEED project would need to demonstrate use of MERV 8 filtration during construction due to the fact that building commissioning is a prerequisite of LEED and s

2
Tue Jan 15, 2013, 6:59 pm

Date and Time Stamped Photos

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  angela cardwell  on 

The LEEDonline forms request photo documentation with Date and Time stamps. My camera only has the capability for the date stamp but not the time stamp.

2
Fri Jun 8, 2012, 9:29 pm