Temp Heating
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Andrew Gil on
The Contractor on a project currently under construction has asked a question that I have not yet encountered on the previous (4) LEED-certified projects that I've worked on: He has asked if a "dir
Alternative HVAC duct sealant
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by John Covello on
Hi, My contractor is proposing and alternative method to sealing the air conditioning ducts. They would like to use a foam for the duct end that would be air tight.
Air cleaning for IEQc3.1 Construction IAQ management plan
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Marina Radchenko on
We are going to apply for 1 point in credit IEQc3.1 but the Contractor is trying to avoid any ventilation during construction: - no natural ventilation - no ventilation by permanent system - no any
additional covers at return air grilles
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Iris Amdur on
In anticipation for a large dust kick-up during finish installation, our project is looking into placing an additional cloth filter on the return air grilles (in addition to the MERV 8 filter).
Washable filters
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Noriko Nagazumi on
Is the "replace all filtration media immediately prior to occupancy" required for washable filters as well? Thanks in advance
IAQ management plan-during construction or before occupancy
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Kali Wolin on
I am wondering if you can obtain the credit for Construction IAQ management plan DURING CONSTRUCTION along with BEFORE OCCUPANCY or if it is just one credit or the other.
smoke leakage test for duct
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Abdulla Anwar on
Our MEP sub-contractor need to clarify if we can use an smoke capsule for duct leakage test, prior to final air leakage test since the project specs is giving a small allowable 1% from basis of des
Clean Room Protocol and SMACNA standards
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Charlie Popeck on
We are currently working on a LEED project where a significant portion of the finished space will classify as “Clean Room” under ISO 14644-1.
Absorptive Materials
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Omar Elrawy on
Dear all, I actually do know what is an absorptive material but only by logic/sense.