NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Omar Elrawy on
Dear all, I actually do know what is an absorptive material but only by logic/sense.
smoke leakage test for duct
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Abdulla Anwar on
Our MEP sub-contractor need to clarify if we can use an smoke capsule for duct leakage test, prior to final air leakage test since the project specs is giving a small allowable 1% from basis of des
HVAC Protection
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Patana Rattananavathong on
I have a project that don't use any HVAC system. It's all natural ventilation. Is it ok to left the HAVC protection out since there is nothing to protect.
documentation
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Adrienn Gelesz on
Hi, I have a question regarding the upload requirements: the form asks for Upload IEQc3.1-1.
Narrative for Option 2 Contractor confimration
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Saud Abdul Rasheed on
Hi all, We are not going to provide photos for this credit but we have an IAQ plan developed and the contractor has been following it according to the credit requirement.
New IEQc3.1 Filtration Media Requirements?
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by R. Ted Krasnesky on
I recently opened the LOL V3 NC form for IEQc3.1 and found that Table IEQc3.1-1 has three new columns - CEN Rating, Min Dust Spot Eff and Arrestance in additon to the MERV rating.
EQc3.1 IAQ Construction during construction
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Kimo Steed on
We are building a new building with concrete precast wall and roof panels with a concrete slab-on-grade.
Natural ventilation for 100% outside air?
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Heather Holdridge on
SMACNA standard recommends under Pathway Interruption (IAQ Management Plan) that : "Depending on weather conditions, the contractor should ventilate using 100% outside air to exhaust contaminated a
Ductwork
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Megan Bove on
Hi. At what moment of a project does the IAQ reporting need to occur?