Forum quick links
Performance Equivalency of CIBSE TM23:2000 for ANSI/ASTM-E779-03
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Jutta Berns on
does anybody have any experience using CIBSE TM23:2000 to test for building air tightness and documenting this under the Alternative Compliance Path for performance equivalency (ANSI/ASTM-E779-03)?
Smoking Prohibition in a Border Crossing Building
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by María Fernanda Aguirre on
We are assessing the possibility of pursuing LEED Certification for a Complex of four buildings at the Border Crossing between Chile and Argentina.
Zero Lot Line Building
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Jamison Hill on
My Building is a zero lot line building. The front of the building directly abuts a public sidewalk and the sides abut adjacent buildings.
Worst condition?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Noriko Nagazumi on
From the requirements: "Verify performance of the smoking rooms’ differential air pressures by conducting 15 minutes of measurement, with a minimum of 1 measurement every 10 seconds, of the differe
Deck to Deck Partition
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Omar Elrawy on
Dear all, I have a gypsum board partitions with a false ceiling all over the floor.
Surrounding Area / Areas
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Omar Elrawy on
If a smoking zone is surrounded by 2 zones, is it sufficient to measure the differential pressure with respect to the zone where a door exist, or I must conduct measurement with respect to each zon
Blower door test form
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Stefania Minotti on
Hi, does anyone know where I can find the ‘’Certificate of Field Verification and Diagnostic Testing’’ that needs to be filled out for each blower door test that is performed, as indicated in ‘’4
Blower Door Test Required?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Wei Jiang on
We have a high-rise hotel project with all guest rooms in the tower and hotel facalities (restaurants, meeting rooms, gym, etc.) in the podium.