MRc5 Option 2
NC-2009 MRc5:Regional materialsposted by Richard Metts on
Hello to All!
I'm trying to figure the following and see if I am understanding Option 2 of MRc5
Parking Garage Structure Part of LEED Project's Material Cost?
NC-2009 MRc5:Regional materialsposted by Adrian Arenas on
We have a project consisting of two LEED buildings sharing a massive Parking Garage (concrete structure). This Parking Garage contain 5 levels.
Extraction point for Recycled Content
NC-2009 MRc5:Regional materialsposted by Rick Alfandre on
I have steel products that a mfg is providing with certain quantities of post consumer/pre-industrial recycled content.
The USE of CSI Division
NC-2009 MRc5:Regional materialsposted by Guillermo Brunzini on
For a project outside of the United States, someone could advise me on the pros and cons of using the CSI Division (optional)?
Thank you!!!
IS Pre-Consumerpercentage fo mrc4 considered for extraction Point in mrc5?
NC-2009 MRc5:Regional materialsposted by Jonathan Foley on
Hi, first time user here.
calculation of material cost
NC-2009 MRc5:Regional materialsposted by Doreen Kruschina on
Hi, in every LEED Project we do struggle in obtaining the material costs as many companies refuse to split their invoices in those for material and those for labour. Question is whether the assumpt
Regional Material for Reinforcement Steel
NC-2009 MRc5:Regional materialsposted by sriram tetali on
Hi , As MRc5 credit Requirment says Raw material extraction and Manufacturing Plant of steel should be below 500 miles (800kms). But in our case the raw materials and manufacturing plant are locate
Regional Materials - Mileage Info
NC-2009 MRc5:Regional materialsposted by Mike Maas on
What should be done for a product that has numerous locations for extraction. For instance, my steel supplier has 47% regional materials, but the sources are from about a dozen different mills.