Forum quick links
CONCRETE & FLY ASH
NC-2009 MRc4:Recycled Contentposted by Michele Helou on
I've got a project with 40% cement substitution (4 mix designs) with fly ash and I thought I would take the opportunity to calculate the recycled content value of fly ash as a percentage of the SCM
Furniture documentation
NC-2009 MRc4:Recycled Contentposted by Nouran Abdel-Rahman on
Can I add the total cost of furniture, and consider it as one item in the LEED form?
Recycled/regional material in total cost if outside LD Boundary?
NC-2009 MRc4:Recycled Contentposted by Laura Charlier on
Hi there, We have a project where the permeable pavers that are going in likely will contain recycled/regional materials we can account for.
Material Cost Calculation
NC-2009 MRc4:Recycled Contentposted by Loretta Maine on
I have a steel supplier who completed a very nice Material Reporting Form for me with a great breakdown of every one of the many products they provided for our project.
LEED Documentation for Steel Subcontractor
NC-2009 MRc4:Recycled Contentposted by Shaunna Shaw on
I work for a construction company that does steel fabrication and erection.
Total Material Default Value
NC-2009 MRc4:Recycled Contentposted by R. Ted Krasnesky on
I recently challenged a LEED reviewers interpretation of the total material default value.
CSI Masterformat
NC-2009 MRc4:Recycled Contentposted by K Nakamura on
We have a project that is using CSI MasterFormat 1995, instead of 2004.
Can we calculate and apply recycled content in reused items?
NC-2009 MRc4:Recycled Contentposted by Renee Shirey on
We are reusing playground equip from the existing bldg and are going to relocate them and use them in our new building/site.
TOTAL MATERIAL COST for PRE-CAST CONCRETE COMPONENTS
NC-2009 MRc4:Recycled Contentposted by anupam verma on
Currently I am working on a project registered under v2.3. My question is related with TOTAL MATERIAL COST for PRE-CAST CONCRETE COMPONENTS in MR credit 4 & 5.
Level playing field for Recycled Content
NC-2009 MRc4:Recycled Contentposted by barbara anderson on
Can someone please tell me how a LEED specification specialist establishes the recycled content requirement?