MRc2 Form Version 0.2.3.. undervaluing commingled waste?

NC-2009 MRc2:Construction Waste Management
posted by  Jake Bebee, LEED AP BD+C, ID+C, WELL AP  on 

I've been reviewing credits for project teams for a while now and cannot figure this out to save my life. One of my team members has mistakenly entered a bunch (about 88% by tonnage) of commingled

2
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Dec 17, 2014, 5:12 pm

MRc2-Concrete Not Poured from Truck and Returned to Batch Plant

NC-2009 MRc2:Construction Waste Management
posted by  Gregg Behmer  on 

Is our leftover concrete, not poured from the truck and returned to the batch plant, counted as diverted from landfills per MR2 if we can provide documentation that it is reused by the batch plant

2
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Dec 15, 2014, 5:10 pm

Column Veneer preserved but covered

NC-2009 MRc2:Construction Waste Management
posted by  Madhura Dhayagude  on 

We are working on a project where the client wants to preserve the existing column veneer, however they want to cover the whole column with a new finish.

3
Tue Dec 2, 2014, 7:46 pm

An unusual situation with Recycling Tickets

NC-2009 MRc2:Construction Waste Management
posted by  Christine Castellano  on 

As the general contractor on a recently completed LEED project, all of the tickets I've received from the off-site waste separation facility listed the tonnage diverted by item, i.e., concrete, met

3
Mon Oct 20, 2014, 4:09 pm

Fire Department Practice Burn

NC-2009 MRc2:Construction Waste Management
posted by  Brian Leet  on 

We have a project on a large campus which has involved demolition of over a dozen buildings.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Oct 20, 2014, 4:02 pm

Recycling Facility Letters of Certification

NC-2009 MRc2:Construction Waste Management
posted by  John Covello  on 

I have a question about doing an overseas project. Do we need some kind of Letters of Certification for the recycling facilities we are using?

5
Default Avatar
Senior Sustainability Manager
UL Solutions
LEEDuser Premium Member
7 thumbs up
Sun Sep 21, 2014, 8:48 pm

Net vs. Gross tonnage

NC-2009 MRc2:Construction Waste Management
posted by  Christine Castellano  on 

On a demo project where material was brought to multiple recycling centers, some of the recyclers gave me both net and gross tonnage, and some only gave me pounds, which i converted to net tonnage.

2
Principal
Sustainable Integration LLC
LEEDuser Basic Member
12 thumbs up
Tue Aug 12, 2014, 7:17 pm

Pulverized gypsum as landfill cap?

NC-2009 MRc2:Construction Waste Management
posted by  Allison Rutter  on 

Hi, I'll be submitting a CIR on this, but does anyone have any guidance on redirecting drywall to be pulverized and used as a cap on a landfill closure?

3
Default Avatar
Smith Gardner, Inc.
LEEDuser Basic Member
0 thumbs up
Tue Jul 22, 2014, 8:23 pm

Documenting Diversion Quantities

NC-2009 MRc2:Construction Waste Management
posted by  Jennifer Kissinger  on 

We have an existing demolition project in which some of the concrete foundations/concrete slabs/block/brick debris can be taken to a recycling facility which will weigh each load, but some of the s

6
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Apr 14, 2014, 11:26 pm

To weigh, or not to weigh?

NC-2009 MRc2:Construction Waste Management
posted by  Lawrence Lile  on 

We have a project with some existing asphalt pavement that will be busted up and used as clean fill on the same project.

2
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Wed Apr 9, 2014, 1:24 am