M&V-option3 for non-us projects
NC-2009 EAc5:Measurement and Verificationposted by ebru unver on
We are working on a NC project, in Turkey. Is our Project is eligible for option 3? Can you give some explanations? Thank you
M&V data reporting
NC-2009 EAc5:Measurement and Verificationposted by Joseph Greene on
Please verify the reporting period is 1 year and not 2. Your sample M&V plan talks about a two year M&V period. Are templates available for data reporting and is there a required format?
M&V Template - End Use Metering Table
NC-2009 EAc5:Measurement and Verificationposted by Candice Rogers on
Hello - We're submitting for M&V under LEEDv2009. We're going with Option D - Calibrated Simulation. Our energy model did not use the performance path.
M&V Option 3 for Building Additions
NC-2009 EAc5:Measurement and Verificationposted by Mark Zoeteman on
If a LEED project boundary only includes a building addition, would the Addition natural gas, electricity and water utilities need to be separately submetered if fed from main building utility serv
It doesn't seem like this
NC-2009 EAc5:Measurement and Verificationposted by Maura Adams on
It doesn't seem like this credit should be so complicated. We have a full DDC system in the new building, which is part of a campus.
How to Determine and Overall M&V Accuracy
NC-2009 EAc5:Measurement and Verificationposted by Margaret McColl on
IPMVP Vol III requires the M&V Plan to include the "expected overall M&V accuracy" (pg 9) and in Section 4.5.9 Option D: Uncertainty it refers to ASHRAE Guideline 14 for guidance.
is a BMS necessary?
NC-2009 EAc5:Measurement and Verificationposted by Alfonzo Collins on
The building we’re for which considering M&V will have 14 submetered apartments (which includes the condensing unit for each), as well as a house meter, for electricity (gas will be on one main
Baseline in LEED reference guide and IPMVP
NC-2009 EAc5:Measurement and Verificationposted by Karoline Geneser on
Considering EAc5, both LEED Reference Guide and IPMVP use the term “Baseline”.
Energy and Atmosphere credit #5
NC-2009 EAc5:Measurement and Verificationposted by James Goldfield on
I had a question in regards to the energy and atmosphere credit #5 which states a need for a measurement and verification plan.