Forum quick links
Baseline in LEED reference guide and IPMVP
NC-2009 EAc5:Measurement and Verificationposted by Karoline Geneser on
Considering EAc5, both LEED Reference Guide and IPMVP use the term “Baseline”.
is a BMS necessary?
NC-2009 EAc5:Measurement and Verificationposted by Alfonzo Collins on
The building we’re for which considering M&V will have 14 submetered apartments (which includes the condensing unit for each), as well as a house meter, for electricity (gas will be on one main
Monitoring in a multi residential complex
NC-2009 EAc5:Measurement and Verificationposted by lance mccardle on
How is this credit addressed in a multi residential complex (77 student apartments) where tenants pay their own energy bills?
EAc5 Option 3
NC-2009 EAc5:Measurement and Verificationposted by Crina Bosch on
We have a large project that is on a DES - We meet the criteria that forces us to include upstream DES equipment.
Energy and Atmosphere credit #5
NC-2009 EAc5:Measurement and Verificationposted by James Goldfield on
I had a question in regards to the energy and atmosphere credit #5 which states a need for a measurement and verification plan.
Energy Star Portfolio Manager Naming
NC-2009 EAc5:Measurement and Verificationposted by April Ambrose on
PIf4 says: Note: Project titles in portfolio manager must be the same as the LEED registered project name.
LEED NC 2009 - EAc5 - M&V
NC-2009 EAc5:Measurement and Verificationposted by Genko Ganev on
Would GBCI accept meter data entry into Energy Star Portfolio Manager for 12 months period as an approved method for M&V for new construction?
VAV System with Reheat
NC-2009 EAc5:Measurement and Verificationposted by Maya Karkour on
Dear All, We have a project installing a VAV air conditioning system with electrical reheat boxes in each zone. The current design assigns energy submeters combining both the electrical reheat wi
Developing the plan post-construction
NC-2009 EAc5:Measurement and Verificationposted by Maura Adams on
Is there any reason that we couldn't develop an M&V plan post-construction, assuming we have the necessary controls in place?