Baseline in LEED reference guide and IPMVP

NC-2009 EAc5:Measurement and Verification
posted by  Karoline Geneser  on 

Considering EAc5, both LEED Reference Guide and IPMVP use the term “Baseline”.

1
Fri Mar 2, 2012, 2:11 pm

is a BMS necessary?

NC-2009 EAc5:Measurement and Verification
posted by  Alfonzo Collins  on 

The building we’re for which considering M&V will have 14 submetered apartments (which includes the condensing unit for each), as well as a house meter, for electricity (gas will be on one main

1
Tue Nov 3, 2015, 8:36 pm

Monitoring in a multi residential complex

NC-2009 EAc5:Measurement and Verification
posted by  lance mccardle  on 

How is this credit addressed in a multi residential complex (77 student apartments) where tenants pay their own energy bills?

1
Thu Mar 10, 2011, 1:07 pm

EAc5 Option 3

NC-2009 EAc5:Measurement and Verification
posted by  Crina Bosch   on 

We have a large project that is on a DES - We meet the criteria that forces us to include upstream DES equipment.

1
Mon Dec 3, 2012, 5:27 pm

Energy and Atmosphere credit #5

NC-2009 EAc5:Measurement and Verification
posted by  James Goldfield  on 

I had a question in regards to the energy and atmosphere credit #5 which states a need for a measurement and verification plan.

1
Fri Feb 10, 2017, 7:06 pm

Energy Star Portfolio Manager Naming

NC-2009 EAc5:Measurement and Verification
posted by  April Ambrose  on 

PIf4 says: Note: Project titles in portfolio manager must be the same as the LEED registered project name.

1
Tue Oct 25, 2011, 7:09 pm

LEED NC 2009 - EAc5 - M&V

NC-2009 EAc5:Measurement and Verification
posted by  Genko Ganev  on 

Would GBCI accept meter data entry into Energy Star Portfolio Manager for 12 months period as an approved method for M&V for new construction?

1
Mon Feb 25, 2013, 8:02 pm

VAV System with Reheat

NC-2009 EAc5:Measurement and Verification
posted by  Maya Karkour  on 

Dear All, We have a project installing a VAV air conditioning system with electrical reheat boxes in each zone. The current design assigns energy submeters combining both the electrical reheat wi

1
Wed Nov 13, 2013, 2:51 pm

types of metering

posted by  Elizabeth Warlop  on 
1
Wed Feb 17, 2010, 7:55 pm

Developing the plan post-construction

NC-2009 EAc5:Measurement and Verification
posted by  Maura Adams  on 

Is there any reason that we couldn't develop an M&V plan post-construction, assuming we have the necessary controls in place?

1