NC-2009 EAc1:Optimize Energy Performanceposted by Nick Morgan on
I am in the process of submitting the LEED templates (2009 NC) for EAp2/EAc1. The building in question has been modeled using Energy Pro and has calculated a baseline virtual energy rate for natur
"DES Energy Cost" Thread Follow-Up
NC-2009 EAc1:Optimize Energy Performanceposted by Joseph Chappell on
In a previous post titled "DES Energy Cost" dating back to May 13, 2013, my interpretation of the responses in the thread is that a project can choose to either follow 90.1 or the DES Guidance from
Preassure drop adjustment
NC-2009 EAc1:Optimize Energy Performanceposted by Jorge Lopez de Obeso on
Hello everyone, we are working on a laboratory and we have very restrictive filtering in some spaces there are equipments that have MERV 7 + MERV 13 + MERV16 filtering sections. In the ASHRAE preas
ASHRAE 90-1 and swimming pools
NC-2009 EAc1:Optimize Energy Performanceposted by Stéphane Paris on
Hi all, I am currently working on a large project including an aquatic center. We plan to use geothermal energy to cover around 90% of the heat required for pool heating.
Spreadsheet for Data Centers
NC-2009 EAc1:Optimize Energy Performanceposted by Ricardo Marques on
Hi, I can´t find the spreadsheet “A Data Center Power Train 1-150170-11A”. I want the latest version the spreadsheet available.
Seeking feedback for denied credit
NC-2009 EAc1:Optimize Energy Performanceposted by Brian Harris on
Please see below for comments from USGBC relative to our design submittal for Portland Fire & Rescue Station 21 (1000020729). We've sent inquires to USGBC several times with no response.
District Thermal Energy Savings
NC-2009 EAc1:Optimize Energy Performanceposted by Matthew Higgins on
Does anyone have experience with district thermal energy by means of a central condenser water loop?
Basecase System selection
NC-2009 EAc1:Optimize Energy Performanceposted by SAMY Chamy on
Dear All:- Our project is G+3 factory building and a floor area of 1,80,000 Sq.ft 80000 Sq.ft is A/c area and remaining areas are Ventilated by fresh air fans so we take system 06-System 6—Pack