Forum quick links
Appendix G - Baseline Building Rotations
NC-2009 EAc1:Optimize energy performanceposted by Kalyan Nishtala on
Hi All, Are baseline building rotations necessary for a new building that is connected to an existing building. Note that the new building is being modeled as a stand alone.
Building thermal Envelope
NC-2009 EAc1:Optimize energy performanceposted by PAWAN DAHIWAL on
R- value of different assemblies in building (conditioned) cannot be averaged. Why?? Only U-value, C-Factors can averaged.again Why??
Energy rate of DES Energy simulation
NC-2009 EAc1:Optimize energy performanceposted by Renaud Gay on
Hi Guys, I am a energy simulation engineer. Now I have a project which uses the district steam supplied by the local government as heat source.
Modeling Snow-Melt Systems
NC-2009 EAc1:Optimize energy performanceposted by David Hubka on
I am modeling a LEED building that includes a snow melt system. The system is served by the building's hot water boiler.
Weighted average for new construction + major renovation?
NC-2009 EAc1:Optimize energy performanceposted by Bethany Beers on
We are performing a review of an energy model for a project that is a major remodel of an existing space with addition of new square footage.
How to get the benefit of automatic shading control device
NC-2009 EAc1:Optimize energy performanceposted by Yusuf Turab on
We are using Visual DOE 4.2 software for energy modeling and we are doing one LEED NC project, the project team is planning to do the automatic sensor control window shading device, and how to take
Baseline HVAC Equip Vs. Proposed HVAC Equip
NC-2009 EAc1:Optimize energy performanceposted by Greengrade User on
Question: Does the HVAC system for the baseline have to be the same type as the proposed design HVAC equipment? (ie.