CHP Modeling

NC-2009 EAc1:Optimize energy performance
posted by  SAMY Chamy  on 

Dear Marcus..... Greetings... In one of our project , we have CHP which fall under Case 1 as given in LEED Guide, CHP under Same Ownership..We have 2 nos of 500 KW Gas Generator which supplies

0

ASHRAE compliance with naturally ventilated building

NC-2009 EAc1:Optimize energy performance
posted by  Jean Marais  on 

As per the guidelines, my baseline mechanical system is incorporated into the naturally ventilated design case model 1 to 1, as a priority 2 kind of system that kicks in when the naturally ventilat

0

G.3.1.3.14

NC-2009 EAc1:Optimize energy performance
posted by  Francesco Passerini  on 

As baseline model I have to model a System 6.

1
Tue Apr 16, 2013, 7:26 pm

Prescriptive EnergyEfficiency nApproach

NC-2009 EAc1:Optimize energy performance
posted by  J.R. Anderson  on 

The LEED 2009 v does not specify the level of efficiency for a small office / mixed use building. Only AEDG 2004 is shown specified.

1
Wed Sep 18, 2013, 6:26 pm

Greenhouse energy consumption

NC-2009 EAc1:Optimize energy performance
posted by  Karl Heitman  on 

We are working on a factory in Chicago which will have food producing greenhouses on the roof.

1
Tue Dec 17, 2013, 9:19 pm

LEED --NC 2009 Summitals platmatel EA credit 1

NC-2009 EAc1:Optimize energy performance
posted by  Yu Tang c850802@ms10.hinet.net  on 

Hello,Anyone : Who can help me where can find LEED --NC 2009 Summitals platmatel EA credit 1 Thanks and best regards, Y.T.

1
Sun Apr 27, 2014, 6:43 pm
1
Wed Jul 28, 2010, 12:38 pm
1
Thu Oct 21, 2010, 6:48 pm

Appendix G - Baseline Building Rotations

NC-2009 EAc1:Optimize energy performance
posted by  Kalyan Nishtala  on 

Hi All, Are baseline building rotations necessary for a new building that is connected to an existing building. Note that the new building is being modeled as a stand alone.

1
Mon Nov 19, 2012, 5:31 pm

Process Load

NC-2009 EAc1:Optimize energy performance
posted by  Muzammal Abbas  on 

Dear all, We are doing a factory project in pakistan, which have a 1200 kw process machinery load, after energy modeling without process load we are saving 55 % from baseline but after adding proce

1
Tue Aug 18, 2015, 1:10 pm