Baseline envelope - Existing Buildings (Retrofit)
NC-2009 EAp2:Minimum Energy Performanceposted by João Costa on
Hello, I would like to ask if anyone has a comment on two questions regarding the baseline model for existing buildings: 1) According to Table 3.1 from Appendix G, thermal loads due to occupancy
Side Lighting - Clerestory
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
Hello everyone, happy Friday!
DES allocation Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
Dear All,
I have a question regarding LEED V2009 BD+C New Construction and Major Renovation, EA P2 - Minimum Energy Performance.
Exhaust not interlocked with HVAC
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hello, we have this residential project were the HVAC system is as follows:
Baseline: System 2 - PTHP
Proposed: Mini Split System
ENERGY STAR certified washer/dryer combos?
NC-2009 EAp2:Minimum Energy Performanceposted by Danielle Waters on
If ENERGY STAR does not have a certification for dryers or washer/dryer combos, are combos excluded from the prerequisite?
Modeling Electric Heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
Hi,
Minimum Energy Performance Calculator – Performance Outputs tab
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings,
In the project we are modeling, there are On-site renewable energy production.
Selecting the HVAC system
NC-2009 EAp2:Minimum Energy Performanceposted by Madushan Samarakoon on
Hi there,
I am working in a LEED project of a 12-story (2 are below ground car parks) City Hotel project with approx. 12000 sqft per floor.