90.1-2007 Table G3.1.1A for Additions and Alterations
NC-2009 EAp2:Minimum energy performanceposted by Evelyn Dicks, EI, CxA on
Do the requirements of Table G3.1.1A Baseline HVAC System Types apply to the whole building or just to the project area for additions and alterations?
Appendix G-Baseline HVAC System
NC-2009 EAp2:Minimum energy performanceposted by Kristin Heinz on
Our project is a bed-and-breakfast with guest rooms that are conditioned using PTHP units. A VRF system conditions the common areas with a DOAS that uses a chiller and hot water boiler.
Lighting power density of a Clinic
NC-2009 EAp2:Minimum energy performanceposted by Rodrigo Dias on
Hello I'm working in a energy simulation of a medical clinic, where it is possible to make some types of exams and diagnoses, but it doesn't have spaces like intensive care or surgical areas.
Treatment of Outdoor Air for Incomplete Spaces
NC-2009 EAp2:Minimum energy performanceposted by Joseph Chappell on
I recently received LEED review comments regarding the treatment of incomplete space in an energy model for a proposed new construction building.
Automatic shades with manual control
NC-2009 EAp2:Minimum energy performanceposted by Erika Duran on
ASHRAE 90.1-2007 mentions that for the Proposed case automatically controlled fenestration devices or shades may be modeled, but manually controlled shades should not be modeled.
Exceptional Calculation for Elevator
NC-2009 EAp2:Minimum energy performanceposted by Thomas Hellmann on
My read on ASHRAE-90.1 and numerous forums, is that USGBC may allow for an exceptional calculation to be performed for elevator energy savings, provided that; 1) Schedule of operation remains the s
Suspended Ceiling
NC-2009 EAp2:Minimum energy performanceposted by Omar Elrawy on
Dear all, I have a suspended ceiling with a 60 cm air gap between the panels and the reinforced concrete slab where all the electro-mechanical lies, but it doesn't act as plenum zone si
Core Performance Guide
NC-2009 EAp2:Minimum energy performanceposted by Tricia Loe on
I have a project that is considering using the Core Performance Guide option for compliance with this credit.
Plant Design for Proposed bldg
NC-2009 EAp2:Minimum energy performanceposted by Julian Park on
If a new building will be served by an existing chiller plant that already serves an existing building, does the Plant design for the Proposed Alternative need to model the full chiller size, even