Heating setpoint - no heating system
NC-2009 EAp2:Minimum energy performanceposted by Luana Bertoletti on
Hi, I have a doubt on how to establish the heating setpoint for an HVAC system which has no heating system. In a specific project, I have only cooling system serving conditioned areas.
All electric Residential Building
NC-2009 EAp2:Minimum energy performanceposted by Emmanuel Pauwels on
Hi, we are working on a residential project.
Baseline service water heater
NC-2009 EAp2:Minimum energy performanceposted by Mark Benson on
In the proposed design, we are using a water-to-water heat pump for the sole purpose of service water heating. Voltage and Amps are 460v and 140 RLA, respectively.
Process Energy for Manufacturing facility
NC-2009 EAp2:Minimum energy performanceposted by Johnathan Woodside on
I have seen several posts pertaining to process energy and how it should be modeled, but I am still unclear as to how it should be treated pertaining to manufacturing process energy.
occupation hours for dormitories
NC-2009 EAp2:Minimum energy performanceposted by Francesco Passerini on
I’m modelling a student house. In some rooms there is an independent kitchen, while in some other rooms there isn't.
Chiller Efficiency: With Errata?
NC-2009 EAp2:Minimum energy performanceposted by Johannes Hopf on
Hello everyone, The reference guide refers to ASHRAE 90.1-2007 with errata without addenda. Now the Minimum Chiller Efficiency for Water Chilling Packages changed. Original Table 6.8.1C: e.g.
BASELINE - Fan Power adjustment
NC-2009 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings, In the design project we are modeling, there are systems which In the Baseline model are to be classified to System 9, System 11 (90.1-3013 for Data Centers) and Parking garage ventilat
Square feet calculation
NC-2009 EAp2:Minimum energy performanceposted by LORENZO ORSENIGO on
Hello, we are working on a project LEED C&S in 2009 of approximately 100,000 square feet. The property doesn't want to implement the energy modeling due to economic issues. Since the project is