Modeling Procedure for ERV,HRW,Treated Fresh Air Units
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All we have model the factory project with 50% A/c and 50% Ventilation and the fresh air is supplied by ERV, HRW, Treated fresh air units to A/c areas but the ERV, HRW, Treated fresh air unit
EAp2 "USGBC approved equivalent"
NC-2009 EAp2:Minimum Energy Performanceposted by Susannah Goddard on
I am working on a project in the UK and the client wants to know what the alternatives are to ASHRAE 90.1 for energy modelling to demonstrate compliance with EAp2 and EAc1.
CS 2009 EAp2-c1 ACP spreadsheet
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In the project I'm modeling (C&S), I took the opportunity to use the CS 2009 EAp2-c1 ACP spreadsheet with integrated calculator. I've come to reach 46% of Energy cost influenced by C
Public Comments Until 11/13
NC-2009 EAp2:Minimum Energy Performanceposted by Glen Phillips on
USGBC released proposed updates to EAp2/EAc1 for LEED 2009, which at its most basic, requires a minimum 4 points under EAc1.
LPD for space types not listed on ASHRAE Table
NC-2009 EAp2:Minimum Energy Performanceposted by Xun Jia on
Does anyone know how the baseline Lighting Power Density should be set up if the space type is not listed on Table 9.6.1 of ASHRAE 90.1 using Space-by-space method?
Future
NC-2009 EAp2:Minimum Energy Performanceposted by Graham Langton on
How should a future process be taken into account?
n/a
NC-2009 EAp2:Minimum Energy Performanceposted by Sivarajah Ragulakeethan on
Hi, Currently I'am working on a LEED Core & Shell mixed development project, and I have an issue on develop model regarding HVAC design.
ASHRAE 90.1 baseline HVAC system type selection
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
In a building where a significant portion is "unconditioned", the baseline HVAC system type selected from table G.3.1.1.A shall be based on total area or on conditioned area only?
Exterior lighting part of 25% process load requirement?
NC-2009 EAp2:Minimum Energy Performanceposted by Catalina Caballero on
Can exterior lighting be part of the 25% process load requirement by Ashrae 90.1-2007 when it comes to energy modeling?
No longer required to complete Design prereqs before review?
NC-2009 EAp2:Minimum Energy Performanceposted by Susan Di Giulio on
From what I have read about the new website, it is no longer required to complete all design prerequisites before submitting for Design Review (split review assumed).