Manufacturing Plant Addition - Option 3
NC-2009 EAp2:Minimum energy performanceposted by Aaron Wascher on
I am working on a manufacturing facility addition where the owner wants to pursue LEED certification. The LEED energy model turned out that we are not going to meet the 10% minimum.
Hvac - Baseline System Descriptions
NC-2009 EAp2:Minimum energy performanceposted by Marina Andrade on
Hi, I am trying to classify an HVAC System (for the Baseline model) of 3731 m2 distribuited on 6 conditioned floors (HealthCare facilities). Checking the Table G3.1.A (Ashrae 90.1-2007) apparentl
weather data
NC-2009 EAp2:Minimum energy performanceposted by Tarek Dalati on
i m using HAP 4.41 for HVAC load calculation and energy modeling but unfortunatly the weather data available is hourly average s it ok to use for leed energy simulation or i ahve to go to another f
What will the minimum OA be if hood exhaust hood is present
NC-2009 EAp2:Minimum energy performanceposted by Haojie Wang on
We have a culinary school, the minimum OA per 62.1 is only 10k cfm, but the fume hood exhaust can go above 100k cfm.
Table 1.4
NC-2009 EAp2:Minimum energy performanceposted by Khaled Fouda on
I have couple of questions about filling table 1.4.7: 1- Table 1.4.7A asks for the total cooling capacity, I use HAP 4.6 and the cooling capacities are calculated according to ASHRAE 90.1.
What if there's no A/C.
NC-2009 EAp2:Minimum energy performanceposted by Patana Rattananavathong on
What if the project don't have any A/C? there are 3 retails, 1 wc. All are separated buildings. What should I do with ASHRAE 5.4, 6.4 and for energy simulation?
MANDATORY REQUIREMENTS AHSRAE 90.1
NC-2009 EAp2:Minimum energy performanceposted by Jorge Torres-Coto on
Does anyone know if isolation valves on a multiple chiller plant are required by ASHRAE, or they simply best practice? I have looked into this in ASHRAE documents, but have not found anything yet.
exceptions and alternative options for vestibules
NC-2009 EAp2:Minimum energy performanceposted by Francesco Passerini on
According to 5.4.3.4 (mandatory provision) enclosed vestibules shall protect building entrances that separate the conditioned space from the exterior.
Target Finder
NC-2009 EAp2:Minimum energy performanceposted by TEY SIUNG on
We are building a Hotel in Doha, Qatar. We are try to apply for LEED certified. While I start , I meet a Target Finder problem. This Target Finder only design for US climate.
Level of detail (cfm) with Trane Trace for LEED -S & L buildings
NC-2009 EAp2:Minimum energy performanceposted by Maria Spastri on
Hi all, For the people who have submitted for LEED (v3) using Trane Trace: To what level of detail do you model the heating and cooling cfm and exhaust cfm on room/zone level for large buildings?