Manufacturing Plant Addition - Option 3

NC-2009 EAp2:Minimum energy performance
posted by  Aaron Wascher  on 

I am working on a manufacturing facility addition where the owner wants to pursue LEED certification. The LEED energy model turned out that we are not going to meet the 10% minimum.

1
Mon Sep 19, 2011, 4:10 pm

Hvac - Baseline System Descriptions

NC-2009 EAp2:Minimum energy performance
posted by  Marina Andrade  on 

Hi, I am trying to classify an HVAC System (for the Baseline model) of 3731 m2 distribuited on 6 conditioned floors (HealthCare facilities). Checking the Table G3.1.A (Ashrae 90.1-2007) apparentl

1
Wed Mar 20, 2013, 6:41 pm

weather data

NC-2009 EAp2:Minimum energy performance
posted by  Tarek Dalati  on 

i m using HAP 4.41 for HVAC load calculation and energy modeling but unfortunatly the weather data available is hourly average s it ok to use for leed energy simulation or i ahve to go to another f

1
Mon Sep 19, 2011, 5:21 pm

What will the minimum OA be if hood exhaust hood is present

NC-2009 EAp2:Minimum energy performance
posted by  Haojie Wang  on 

We have a culinary school, the minimum OA per 62.1 is only 10k cfm, but the fume hood exhaust can go above 100k cfm.

1
Thu Mar 31, 2016, 1:37 pm

Table 1.4

NC-2009 EAp2:Minimum energy performance
posted by  Khaled Fouda  on 

I have couple of questions about filling table 1.4.7: 1- Table 1.4.7A asks for the total cooling capacity, I use HAP 4.6 and the cooling capacities are calculated according to ASHRAE 90.1.

1
Tue Sep 9, 2014, 6:04 pm

What if there's no A/C.

NC-2009 EAp2:Minimum energy performance
posted by  Patana Rattananavathong  on 

What if the project don't have any A/C? there are 3 retails, 1 wc. All are separated buildings. What should I do with ASHRAE 5.4, 6.4 and for energy simulation?

1
Mon Oct 10, 2011, 4:09 pm

MANDATORY REQUIREMENTS AHSRAE 90.1

NC-2009 EAp2:Minimum energy performance
posted by  Jorge Torres-Coto  on 

Does anyone know if isolation valves on a multiple chiller plant are required by ASHRAE, or they simply best practice? I have looked into this in ASHRAE documents, but have not found anything yet.

1
Thu Jan 26, 2017, 8:39 am

exceptions and alternative options for vestibules

NC-2009 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

According to 5.4.3.4 (mandatory provision) enclosed vestibules shall protect building entrances that separate the conditioned space from the exterior.

1
Wed Oct 15, 2014, 12:39 am

Target Finder

NC-2009 EAp2:Minimum energy performance
posted by  TEY SIUNG  on 

We are building a Hotel in Doha, Qatar. We are try to apply for LEED certified. While I start , I meet a Target Finder problem. This Target Finder only design for US climate.

1
Mon Nov 28, 2011, 4:48 pm

Level of detail (cfm) with Trane Trace for LEED -S & L buildings

NC-2009 EAp2:Minimum energy performance
posted by  Maria Spastri  on 

Hi all, For the people who have submitted for LEED (v3) using Trane Trace: To what level of detail do you model the heating and cooling cfm and exhaust cfm on room/zone level for large buildings?

1
Fri Mar 24, 2017, 5:51 pm