Louvers on Solid Surface
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
I have a case of Southern aluminum louvers that do cover the entire wall, and I'am modelling the basecase without these louvers.
Relative humidity control in base case
NC-2009 EAp2:Minimum Energy Performanceposted by jane kane on
Hi there, need help for energy simulation. We have a workshop consists of two air conditioned workshops/labs that require 7ach and Relative humidity to be maintained at 50+/-10%.
Naturally ventilated offices- mild temperate climate-loads unmet
NC-2009 EAp2:Minimum Energy Performanceposted by Paul Overy on
We have a narrow plan 3 storey naturally ventilated building with radiators (baseboard) in temperate Ireland. Some windows are user controlled and some controlled by the BMS, with night purge.
Electric Forklift truck included in Energy model?
NC-2009 EAp2:Minimum Energy Performanceposted by Silvia Ruiz on
Hi, I'm working on the certification of a storage and distribution center that will have an electric forklift truck as part of its operations.
Question Regarding Process Loads
NC-2009 EAp2:Minimum Energy Performanceposted by Brian Salazar on
Hello again! We are finalizing our model for a v3 Core and Shell Building Renovation. Our model is telling us that our process loads are under the requisite 25%, 23.66% to be exact.
ASHRAE 90.1 2004 TABLE 6.8.1D
NC-2009 EAp2:Minimum Energy Performanceposted by Keerthi Ratnayake on
Hi, Our problem is with PTHP (cooling mode) new construction. The footnote 'c' is bit confusing.
Opaque panels
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Similarly to the situation of this picture http://www.waymarking.com/gallery/image.aspx?f=1&guid=89c50354-3bc4-459b-a423-3b962523167c in the windows that I’m modelling there is a transparent pa
System 7: selection of heating system
NC-2009 EAp2:Minimum Energy Performanceposted by Roberto Oshiro Gama on
I,m working on a project were the proposed building has 2 ground water heat pumps with total capaciyt approx. 2300 kW.
Baseline System? 110,000 sf building w/ code exh requirement
NC-2009 EAp2:Minimum Energy Performanceposted by Joe Bouley on
I'm working on a Vehicle Maintenance Facility that is one-story, 110,000 sf with the following breakdown: -approx 85,000 sf of indoor parking -approx 11,000 sf of mechanics bays -approx 1
Existing HVAC Baseline Modelling criteria
NC-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
Hi, I have modelled a project following Appendix G.