Forum quick links
Is this credit possible ER's/ Airports etc?
NC-2009 SSc8:Light pollution reductionposted by Jane Long on
Does anyone have any experience of this credit for a 24hr building (such a an ER or airport) where lighting levels are prescribed by the building use (runway lighting, ambulance unloaded bay) and a
Exterior Ilumination Soccer Field
NC-2009 SSc8:Light pollution reductionposted by LEED Pro Consultant on
I'm working on a project in Mexico and I would like to know the maximum light power density allowed on a soccer field.
Lighting Boundary question
NC-2009 SSc8:Light pollution reductionposted by Erin Holdenried on
I have a project building pursuing certification that is located on a campus.
Photometrics
NC-2009 SSc8:Light pollution reductionposted by Saju Varghese on
Can photometric plan be created with trees in it to avoid the leakage of light pollution? Thanks.
"Lighting Boundary" definition and use
NC-2009 SSc8:Light pollution reductionposted by Anya Fiechtl on
LEED interpretation 10236 (http://www.usgbc.org/leed-interpretations?keys=10236&=Search#) seems to indicate that the lighting boundary is a modification of the project boundary (e.g.
Sample site plan
NC-2009 SSc8:Light pollution reductionposted by Bill Swanson on
I think it would be good to show a sample submittal with a plan view of the site. Most people seem to think this credit is easy since the calculations they've seen were done wrong.
LEED Projecdt Boundary and SSc8
NC-2009 SSc8:Light pollution reductionposted by Greengrade User on
Our project is a major rehab of an existing classroom, class lab and academic department office building located on a college campus.
Ecotect
NC-2009 SSc8:Light pollution reductionposted by Omer Moltay on
Does anyone have an experience with Ecotect in exterior lighting calculations?
Facades not in LEED Project boundary
NC-2009 SSc8:Light pollution reductionposted by Antonio Marquez on
It is necessary to check the level of lighting in facades that are not in the limit of the project boundary? (This facades are in plazas inside the project boundary, but not in the limit)
LEED boundary - no parking lot
NC-2009 SSc8:Light pollution reductionposted by Danna Lopez on
The LEED boundary for our project does not include the parking lot near the building.