Vertically attached - clarifications
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Martin Meehan on
Quoting MPR Supplemental Guidance document (Buildings attached to non-certified buildings, page 17): "1) VERTICALLY ATTACHED, LEED-EB: O&M, AND MAJOR RENOVATION PROJECTS If the certifying proj
Horizzontally attached bldg addition to Non Certified building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Tesfa Bogale on
We are working on a new building addition. The new addition building will be attached horizontally to a non LEED-Certified building.
2 buildings but cannot function independently without the other
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Miriam Ramirez Baumgarten on
Hi, We have a project that includes a Hangar, with two levels of administrative offices and workshop area in one 250,000sf building.
Single Building Certification_LEED New Construction 2009
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Aswin M on
We have a Garment factory project that has three blocks with connectivity bridge. The three blocks are namely Cutting block, Sewing block, and Fabric store block.
Resort Hotel and Condo
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Zehren on
I am working on a 7 story resort hotel and condo under LEED 2009 NC. We just received word that the 9 Condos on floors 6 and 7 will be finished at a future date.
Office tower on a shopping center "plinth"
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Ricardo Sá on
I'm working on a project that consists of an office building tower that will be erected on top of a shopping center built 20 years ago.
Tenant Guidelines for CS spaces within NC
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Melanie Silver on
We are working on a large residential project that has two very tiny retail spaces at the base (one less than 500 sf, and the other about 1500 sf).
Major renovations
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Veronica Reed on
Hello, what level of intervention would constitute as "Major Renovation"?
Residential high rise with school at the base
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Ilana Judah on
We are designing a high-rise residential tower with a school and retail area at the base. There is some entry and service space serving the residential tower on the cellar and ground floor levels.
Existing Building Renovation and Site Work
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Catherine Adams on
We have an existing two-story community recreation center with an adjacent parking lot. Most(about 75%) of the building interior will be renovated, with some new windows added to the perimeter.