Forum quick links
MPR2 LEEDuser Forum questions and comments prior to the 09/05/17 upgrade
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Brian Bartholomew on
Did we lose access to all the MPR2 LEEDuser Forum questions and comments posted prior to the 09/05/17 upgrade?
LEED-NC and Interior Fitout
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by CT G on
An owner is developing an office building which is to 75% occupied by one company (different from the owner developing the building).
new building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Bo Slendak on
We are currently doing a government facility and the project requires a LEED notebook be kept. Not having done this prior I need some guidance as to what and how to complete.
Exclude retail?
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Mike D on
Our project has got some retail on the ground floor of an office building that the design team does not want to include in the LEED assessment.
LEED CI Project Boundary - Non-conjoining Spaces
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Matthew Catterall on
We have a project for a single entity that owns and occupies an entire building. They are required to achieve LEED silver on this renovation per their local code.
Clarification MPR#2 - LEED NC 2009 v3 - Airport extension
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Wim Maassen on
How to set LEED Building boundary for new extension of an airport? In next phases other new extensions/will be added.
Lobby Renovation
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Jonathan Weiss on
Thanks, Tristan, for redirecting me here! We are completing a LEED NC for a major renovation for a building on a campus.
Elegibility of Overwater Bungalow projects
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Luis Huertas on
The proposed project is located in an island and the intent is to locate bungalow cabins over water in piers (see: http://www.islands.com/gallery/top-19-overwater-bungalow-resorts) along with some
office space in existing building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Yukari Treible on
We are designing an office space in one floor of an existing building. It will be gutting and full fit-out of this floor alone; nothing else in the building will be touched and the exist.
LEED V4 DATA CENTER
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Caroline Vallieres on
There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.