Building on existing peer but parking on "reclaimed" land
NC-v4 MPR1:Must be in a permanent location on existing landposted by Eesmyal Santos-Brault on
Our project will include a renovation and expansion of an existing building on an existing peer in the ocean, so it meets MPR 1, but the owner plans to add a new peer to build a parking lot adjacen
ACP for India
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Renu Rani on
Is there any ACP available for India?
Project Currently Running at 10 Cyc - Am I eligible for 3 pts
EBOM-v4 WEc3:Cooling tower water useposted by Robert Cox on
Hello - Based on the water analysis provided by our vendor, we can achieve 11 cycles prior to requiring treatment. We are currently using 10 cycles. Does this qualify for 2 or 3 points?
Option 2
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Bill Freeman on
Paula, has there been an official ruling from USGBC on whether REACH can be used under Option 2 for LEED projects within the U.S. If yes, is there a document that provides this information?
Flooring Minimum
CS-v4 EQc2:Low-emitting materialsposted by Michelle Rosenberger on
We have a CS warehouse that is struggling to achieve certification that will build out only restrooms and has no identified tenant to execute a lease agreement with.
Aerothermal Energy
NC-v4 EAc5:Renewable energy productionposted by Helena Garcia on
We're designing a system based on renewable energy installation for new construction. A part of this installation would performed by aerotermal energy.
Points table can be based on rating system
NC-v4 LTc1:LEED for Neighborhood Development locationposted by Bazeeth Ahamed K M on
The points table can be based on rating system like NC, CS, School etc instead of BD&C
Green e energy equivalency EKOenergy
CI-v4 EAc6:Green power and carbon offsetsposted by Valentin Grimaud on
Good afternoon, I'm working for a design building company in France. We aim the LEED certification for a shop project. We try do get 2 points for the Green Power and carbon offset credit.
Building Entrances
NC-v4 EQp2:Environmental tobacco smoke controlposted by Johanna Scogin on
We have some overhead rolling doors (for trucks to enter the garage portion of the commercial building) along with some man doors.
DES systems
CS-v4 EAc2:Optimize energy performanceposted by Mike D on
If the building is connected to a DES system, do both the DES system as well as the building itself need to be modelled?