Forum quick links
EPDs used in CS project, can be accounted for in CI project?
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Sara Johansson on
If a CI project is located in a CS building and the tenant requires no fit out, can EPDs for products in the tenants space in the CS certification be used for the CI certification?
Logistic Warehouse
NC-v4 EQc7:Daylightposted by Helena Garcia on
Our project is a logistic warehouse which is divided into two buildings.
Public Shuttle to Ferry/Rail
NC-v4 LTc5:Access to quality transitposted by Kristen Magnuson on
I know private shuttles do not count, and the LEED credit language emphasizes walking distance; however, can you count the trips at a ferry station and train station that are accessible through pub
Existing HVAC system efficiency
CI-v4 EAp2:Minimum energy performanceposted by Richard Mathews on
Let's say I'm doing a tenant job in an existing office building, and the tenant is served by an existing rooftop AC unit.
Cutsheet unavailable
EBOM-v4 WEp1:Indoor water use reductionposted by Charalampos Giannikopoulos on
If manufacturer documentation is unavailable and the flow/fixture rate is unknown is it allowed to physically measure and time water consumption rates for at least a 20% of the fixtures of each fix
Which parameters of the cooling tower?
NC-v4 WEc3:Cooling tower water useposted by Jade Deltour on
Which parameters/performances of the cooling tower need to be checked/optimised to limit tower cycles to avoid exceeding maximum values?
CSR following UN Global Compact
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Ana García on
Hello! U.N. Global Compact - Communication of Progress is a LEED compliant CSR frameworks.
Building's equipment still uncertain
NC-v4 EAc3:Advanced energy meteringposted by Maria Matos on
Hi Marcus, We are working on a building which will have the following uses: offices, laboratory (pharmaceutical), showers and changing facilities, canteen and a smaller bar.
Is a Rollout Mat considered a permanent entryway system?
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by Tim Nabholz on
According to the language provided for the credit: "Acceptable entryway systems include permanently installed grates, grilles, slotted systems that allow for cleaning underneath, rollout mats, and
Access to quality transit
NC-v4 LTc5:Access to quality transitposted by Subrota Roy on
Hi, I want to know clearly what is Access to quality transit? Also how can i achieved this credit point for LEED NC v4. Pls share with me compliance path,what type of documentation needed?