Forum quick links
Open Space
NC-v4 SSc3:Open spaceposted by Jorge Lopez de Obeso on
Hi, in order to getting to know the new V4 we are taking a look at each credit and start to getting familiar with them. The leed reference guide doesn't use the same project in both examples for fu
Recycled Water
CI-v4 WEc1:Indoor water use reductionposted by ESD Engineer on
The building our project is located in uses municipally supplied recycled water to serve the supply to the water closets and urinals. Can this be used to calculate additional savings?
Allowed minor improvents
NC-v4 LTc2:Sensitive land protectionposted by soha yamani on
what the word clearings mean in the allowed minor improvement section for water bodies and wetlands ?
100% well or non-potable water
EBOM-v4 WEc3:Cooling tower water useposted by Elizabeth Dunn on
Our building uses 100% well or non-potable water.
Cutsheet unavailable
EBOM-v4 WEp1:Indoor water use reductionposted by Charalampos Giannikopoulos on
If manufacturer documentation is unavailable and the flow/fixture rate is unknown is it allowed to physically measure and time water consumption rates for at least a 20% of the fixtures of each fix
Which parameters of the cooling tower?
NC-v4 WEc3:Cooling tower water useposted by Jade Deltour on
Which parameters/performances of the cooling tower need to be checked/optimised to limit tower cycles to avoid exceeding maximum values?
CSR following UN Global Compact
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Ana García on
Hello! U.N. Global Compact - Communication of Progress is a LEED compliant CSR frameworks.
Building's equipment still uncertain
NC-v4 EAc3:Advanced energy meteringposted by Maria Matos on
Hi Marcus, We are working on a building which will have the following uses: offices, laboratory (pharmaceutical), showers and changing facilities, canteen and a smaller bar.
Is a Rollout Mat considered a permanent entryway system?
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by Tim Nabholz on
According to the language provided for the credit: "Acceptable entryway systems include permanently installed grates, grilles, slotted systems that allow for cleaning underneath, rollout mats, and
Access to quality transit
NC-v4 LTc5:Access to quality transitposted by Subrota Roy on
Hi, I want to know clearly what is Access to quality transit? Also how can i achieved this credit point for LEED NC v4. Pls share with me compliance path,what type of documentation needed?