Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Automatic Receptacle Control for Renovation projects

CI-v4 EAp2:Minimum energy performance
posted by  Jeni Panars  on 

ASHRAE requires at least half of all private offices, open offices, and computer classrooms to be controlled by an automatic control device.

1
Thu Jun 29, 2017, 12:24 am

100% OA Laboratory System

NC-v4 EAp2:Minimum energy performance
posted by  Charles Daze  on 

I have a HVAC system with labs on it requiring 100% outside air systems. Following all the guidance in 90.1 these spaces require a dedicated Sys 5/7 because they are over 5,000 cfm.

1
Thu Oct 6, 2016, 3:05 pm

Elevator lobbies -with airlocks?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Florian Schmidtchen  on 

Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention.

0

Air quality testing for targeted chemicals

Homes-v4 EQc2:Contaminant control
posted by  Peter Doo  on 

Based on a conversation with Centek Labs, the CDPH test methodology for targeted chemicals is for products and not a building. The test would require heating the building (really?).

1
Thu Nov 13, 2014, 3:39 pm

LEED ND Plan Scope

ND-Plan-v4 MPR2:Must use reasonable LEED boundaries
posted by  Eduardo Straub  on 

In a future leed ND plan project, that comprises, besides all of the community needs and infrastructure, an enclosed condominium of houses, is it possible to include in the LEED Certification this

1
Mon Dec 19, 2016, 7:34 pm

Autocontrol vs smart sensor-activated faucets and duration times

NC-v4 WEp2:Indoor water use reduction
posted by  Heather DeGrella  on 

Per the LEEDv4 Reference Guide "Duration-based savings from auto-control faucets w/ automatic fixture sensors or metering controls are no longer allowed in the design case.

1
Thu Jan 29, 2015, 10:27 pm

EPDs and Manufacturing Dates

CI-v4 MRc3:Building product disclosure and optimization - environmental product declarations
posted by  Michelle Rosenberger  on 

Does an EPD need to be issued before the manufacturing date of the product installed? Or do we just need to provide an EPD for that product when we submit for certification?

1
Mon Apr 10, 2017, 2:21 pm

CI in a CS project

CI-v4 LTc2:Surrounding density and diverse uses
posted by  Sara Johansson  on 

If a tenant chooses to certify ith CI in an already CS v.4 certified building (that has earned full points for Surrounding Density and DIverse Uses as well as Access to Quality Transit, Bicycle Fac

1
Fri Mar 31, 2017, 1:32 pm

What is the baseline assumption for this credit?

CI-v4 IPc1:Integrative process
posted by  Betty Liu  on 

Hi All, We are designing a CI v4 office space in an existing high-rise building.

1
Mon Jul 17, 2017, 2:03 pm

CO2 monitoring densely occupied spaces, exemption rooms <150 sf

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Maria Porter  on 

Why are not small rooms (less than 150 sf) exempt from the CO2 monitoring requirements? In EB:OM and several other places and standards they are.

1
Mon Nov 4, 2013, 7:17 pm