Forum quick links
Buildings w/ programmatic dependency/architectural cohesiveness
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Ricardo Sá on
I have a client that is developing an open-air type shopping center (i.e., the tenant stores are arranged in blocks that open to exterior interconnecting walkways) and is willing to pursue LEED cer
The year of metering
EBOM-v4 EAp2:Minimum energy performanceposted by Vindio Corro on
Must be the year of metering after the registration of the project or can be used a year of metering of before?
REACH
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Jonathan Weiss on
I see that REACH is listed as an international compliance path, what about a US based project that is using some REACH compliant materials - some specialized application flooring, for example, is m
Home size credit calculation
Homes-v4 EAp4:Home sizeposted by Jean Henderson on
Developing 130 unit condo project. 24 are 2 bdr (average size 36% below ES ref home). Rest are 1bdr (average size 24% below ES ref home).
Non-Conventional purchases
EBOM-v4 MRc1:Purchasing - ongoingposted by Becky Stumm on
I'm working on a convention center, and they don't buy many office supplies. Their major purchases are cleaning supplies ( and fits in the IEQ- green cleaning credit) and uniforms.
MERV filters
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Is there any mandatory filter efficiency requirement (MERV) for projects located in areas with a very high PM2.5 levels? Is it mandatory for ASHRAE 62.1-2010 requirements?
Heat pump water heater
CS-v4 EAc6:Enhanced refrigerant managementposted by Ammon Palmer on
We are using a heat pump type water heater. The refrigerant capacity for the unit is over the 0.5 lb threshold.
Reduced parking footprint for College/University
NC-v4 LTc7:Reduced parking footprintposted by Iris Amdur on
The project is a single building which is part of a larger educational campus.
Building Eligibility + Project Boundary
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Julia Perez on
Hi I have a bit of a particular project here, let me explain. We want to certify 5 office buildings under LEED v4 EBOM.
Percentage below water consumption maximum
EBOM-v4 WEp1:Indoor water use reductionposted by on
If the percentage below water consumption maximum is calculated to be -22% (not 0%) by using the calculator, is the pre-requisite met or not?