IEQ Space Matrix?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Erica Downs on
Is the IEQ Space Matrix still relevant for this Prereq under v4?
VOC Budgets and Select One Option Guidance
NC-v4 EQc2:Low-emitting materialsposted by Michelle Rosenberger on
We have a v4 project that would like to use a small amount of a coating product that does not meet VOC content requirements.
Factory-finished docklevellers
NC-v4 EQc2:Low-emitting materialsposted by Agnieszka Rylska on
Hello,
Biodegradable, Recyclabe Plastic Pail LEED Credit Contribution?
NC-v4 MRp2:Construction and demolition waste management planningposted by George Gornick on
We manufacture sealant that we package in a 5 gallon plastic pail made from Type 2 HPDE and additives that make it Biodegradable. The pail will degrade in 120 days in the landfill.
2 or 4 points?
NC-v4 LTc5:Access to quality transitposted by Raphael Sperry on
Anyone know why you can get 3 points for 144/108 weeday/weekend trips, and 5 for 360/216, but not 4 for 252/162, or 2 points if between teh thresholds for 1 and 3?
Batteries, mercury lamps, and electronic waste
NC-v4 MRp1:Storage and collection of recyclablesposted by Gregory Martin on
I was curious how much space for these new items needs to be set aside?
LEED ND - Transportation Demand Management : Vehicle-share spaces with high/low frequency transit
ND-Plan-v4 NPDc8:Transportation demand managementposted by Nuttanee Vongveeranonchai on
Dear all,
LEED V4 NC Healthcare project EAc2 points table guidance?
NC-v4 EAc2:Optimize energy performanceposted by Aditya Potipireddi on
Hello All,
Insulated Metal Panel
NC-v4 EQc2:Low-emitting materialsposted by Erin Holdenried on
Any thoughts how an insulated metal panel would (or would not be included) in the credit for the Option 1 path? I assume is would not need to be included as it is a factory-finished metal pro
Previous Owner to Demolish Building Prior to Our New Owner Taking Control
NC-v4 MRp2:Construction and demolition waste management planningposted by Steven Blais on
Our client is negotiating to lease or acquire property to construct new facilities.