Forum quick links
Zero Lot line Plot and Option 2 Scenario
NC-v4 SSc4:Rainwater managementposted by Boobalan Saravanan on
Hi all.
Diverse Uses within Existing Building on Addition Project
NC-v4 LTc4:Surrounding density and diverse usesposted by Eric White on
Our project is a 5 storey addition to the east side of an existing campus centre.
Surrounding density
NC-v4 LTc4:Surrounding density and diverse usesposted by chaima michou on
for option 1 is the density found to be equal to or greater than the values in the table!!
Four (4) Surrounding LEED Silver Buildings
NC-v4 LTc1:LEED for Neighborhood Development locationposted by Daniel Davis on
I am with a General Contractor, and we have completed four (4) BD+C New Construction LEED Silver buildings for a college in Kentucky between the years 2009-2013 (I think all under v3). We are
Residential project water fixtures and appliances water use
CS-v4 WEc2:Indoor water use reductionposted by Andrzej Gutowski on
Dear collegues,
E-Waste - Safe recycling
CI-v4 MRp1:Storage and collection of recyclablesposted by Peter Elliott on
Our IT department bids used computers, monitors and servers to e-waste liquidators. Is this considered an acceptable and safe recycling method for e-waste?
Tenant lighting savings without layout
CS-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone,
Generaly for CS project we model tenant spaces as unfinnished and we use perimeter/core zonning method.
Female Bidets in LEED calculation?
NC-v4 WEp2:Indoor water use reductionposted by Hieu Huynh on
Hi LEED experts,
Glare-control devices - glazed doors?
CI-v4 EQc7:Daylightposted by Victoria Watson on
Hi - When the user guide says "provide glare-control devices for all transparent glazing" does it really mean all? I am assuming it doesn't mean high volume doors with transparent gl