Forum quick links
Parking not provided
NC-v4 LTc7:Reduced parking footprintposted by Ana Milinkovic on
Hi everybody.
I have just a simple question. If in my project parking is not provided, can I award this credit?
Project located on reclaimed land
NC-v4 MPR1:Must be in a permanent location on existing landposted by Nermin Hegazy on
I would like to know what is LEED's take on developing a site which is on reclaimed land. The land for the site is not specifically claimed for the project, it has been reclaimed about 1
LEEDv4 HD Quality Views Credit - perimeter area calculation
Healthcare-v4 EQc8:Quality Viewsposted by Tim Hemsath on
Page 740 of reference guide, second paragraph "For other areas, confgure the building foor plates such that the foor area within 15 feet (4.5 meters) of the perimeter exceeds the perimeter area req
Kitchen tab for Core and Shell project
NC-v4 WEc2:Indoor water use reductionposted by Linh Dang on
Hello LEED user experts,
CWMP in ND used for individual buildings (BD+C) within ND boundary?
ND-Plan-v4 GIBc16:Solid waste managementposted by Jackson Ludwig on
Working on an ND project, and curious about the CWMP requirement on this credit. Can this same ND CWMP be used on individual buildilngs pursuing BD+C within the ND boundary for materials
Certification time
NC-v4 IPc1:Integrative processposted by Helena Garcia on
Hi everyone,
Does anyone know if there is a time limit or a deadline from when a project is registered until certification is achieved?
Thank you in advance.
Flooring - inherently nonemitting sources
NC-v4 EQc2:Low-emitting materialsposted by Dave Hubka on
Concrete is considered to be fully compliant without any VOC emissions testing if the concrete does not include integral organic-based surface coatings, binders, or sealants.
network for bicycles in Vietnam
NC-v4 LTc6:Bicycle facilitiesposted by Alex Edwards on
Hello everyone! I am from Vietnam, we are doing a project to pursue LEED certification, I am interested in the criteria of bicycle vehicles.