Forum quick links
LCA and Renovating an Existing Building
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Dana Murdoch on
I am considering using this pilot credit for a renovation project of a residence hall.
ACP for MRc1.1,4,5?
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Nathan Lee on
I know this is probably the most basic of questions, so please bear with me. I am trying to figure out the application of points for PC1 and if it is an ACP for the MR credits listed above or if t
LEED LCA Calculator
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Kelly Roberts on
The link to the LEED LCA Credit Calculator does not appear to be working anymore.
Athena calculator questions
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Laura Whitehurst on
1. What is the difference between an open web steel joist and a plain steel joist?
LEED LCA score
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Laura Whitehurst on
I am having significant problems with the LEED LCA score calculator. I am doing 6 buildings of 1-4 stories, and they are all getting similar scores, in the 134-147 point range.
Allowed exclusions
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Frances Yang on
We would very much like to pursue this credit on our project. However, we have some unusual wall assemblies for blast resistance.