Experiences about ACP Pilot Credit – No Cooling Tower (WEpc94)?
Pilot-Credits WEpc17:Cooling tower water useposted by Christina Nybergh on
Hi, anyone got any experience with the Alternative Compliance Path WEpc94 – No Cooling Tower?
Providing verification that there will be side stream filtration
Pilot-Credits WEpc17:Cooling tower water useposted by Sara Greenwood on
Our project is pursuing an ID point for Pilot Credit 17 under the LEED-NCv2009 rating system.
Never Have Cooling Towers
Pilot-Credits WEpc17:Cooling tower water useposted by Janice Rogers on
We do small renovations and have never installed or replaced a cooling tower. Do I still have a "no" credit even if I can't meet the criteria of the credit because we don't have the equipment?
One-Time Potable Water Analysis
Pilot-Credits WEpc17:Cooling tower water useposted by Edward Malesevich on
When the credit requirements ask for a "one-time" potable water analysis to be conducted, what sort of time-frame is required for this to be completed?
Cooling tower cycles
Pilot-Credits WEpc17:Cooling tower water useposted by Phuc Do on
Hi all, Our project is using Munters cooling tower in which the cooling tower cycles measured continuously and the dump cycle adjusted accordingly.
How long does the monthly monitoring last for?
Pilot-Credits WEpc17:Cooling tower water useposted by William Wong on
One of the mentioned requirements is to report results of the amount of potable water used, microbiological levels, blowdown and corrosion on monthly basis, but for how long after occupancy?
Basic learning...
Pilot-Credits WEpc17:Cooling tower water useposted by Kath Williams on
For a "non-engineer," could someone please explain what I'm hearing on the project testing this pilot credit--operator concern that cooling tower won't perform as designed and water-testing analys
Sidestream filter?
Pilot-Credits WEpc17:Cooling tower water useposted by Jonathan Weiss on
The credit requirements do not call for a sidestream filter, but the documentation requirements list that we should confirm that a sidestream filter is being provided. Why is that?
Sand Filter
Pilot-Credits WEpc17:Cooling tower water useposted by Kenner Kingston on
The credit requirement #5 asks for a "diagram showing meter locations, sand filter.: Is a sand filter required to meet the credit?
Pipe Corrosion Rates
Pilot-Credits WEpc17:Cooling tower water useposted by Charles Chaloeicheep on
How do you determine the predicted acceptable corrosion rates for each pipe material in the condenser water system?