Forum quick links
Phone Booth Room Ventilation
CI-v4 EQp1:Minimum indoor air quality performanceposted by Ciaran McCabe on
Under LEED v4 ID & C for an Office Fit-Out;
V4 IAQ ventilation rate
CI-v4 EQp1:Minimum indoor air quality performanceposted by Jerry Young on
I am working on a project using the V4 CI rating stsem. For IAQ ventialtion rate, the standard references and has the calculator for using 62.1 2010 or 2013.
62 2010 MZ Calc excel for LEED v 4.
CI-v4 EQp1:Minimum indoor air quality performanceposted by Sadaf Alam on
Hi ,
Does anyone have 62 2010 MZ Calc excel for LEED v 4.
Minimum flow setting and the design cooling flowrate
CI-v4 EQp1:Minimum indoor air quality performanceposted by kin bong poon on
""It appears that the Ventilation Rate Procedure (VRP) calculations may not have been performed for the worst-case conditions, as it is not clear if the cooling condition calculations analyze the l
Minimum IAQ performance LEED CI v4
CI-v4 EQp1:Minimum indoor air quality performanceposted by Donna Juselis on
Credit states "Monitoring Mechanically ventilated spaces For mechanically ventilated spaces (and for mixed-mode systems when the mechanical ventilation is activated), monitor outdoor air intake fl
Fresh air/Outdoor air through infiltration
CI-v4 EQp1:Minimum indoor air quality performanceposted by Mahesh Shankar on
I am working on a CI project which is a factory/office space. The AHU provides fresh air only in certain spaces.
Circulation of Fresh air via AHU
CI-v4 EQp1:Minimum indoor air quality performanceposted by BEE Incorporations on
My project has 3 areas. Project AHU serves conditioned air to Area 1,2 and 3. The fresh air is supplied only to Area 1 directly from base building AHU due to constraints.
Mulitzone FCU with VAV
CI-v4 EQp1:Minimum indoor air quality performanceposted by Gopinath Vasu on
Mechanical ventilation and natural ventilation system requirement?
CI-v4 EQp1:Minimum indoor air quality performanceposted by shashank gangil on
We are doing a LEED CI project which is located in LEED Certified building. The Base building already has provision for natural ventilation in the form of operable window.