how are points dealt with when there is no cooling tower

EBOM-v4 WEc3:Cooling tower water use
posted by  Raquel Viula  on 

Hello, would anyone know if, in EBOM v4,  the points for the WE credit: Colling Tower Water Use get filtered out from the LEED score calculation or are gained by default, when there

3
Mon Jul 17, 2023, 5:21 am

Water test location

EBOM-v4 WEc3:Cooling tower water use
posted by  Clive Lacey  on 

Water test for Cooling tower should be done on site?

0

Water test location

EBOM-v4 WEc3:Cooling tower water use
posted by  Omar Elrawy  on 

Dear all,

Should we test makeup water from the water source (incoming), or from inside the cooling tower itself?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Aug 16, 2022, 6:04 pm

DES Cooling tower

EBOM-v4 WEc3:Cooling tower water use
posted by  Elyse Dufrene  on 

Can DES cooling tower serving the project be used to demonstrate water consumption reduction for cooling tower water use credit?

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Fri Mar 15, 2019, 3:21 pm

Project Currently Running at 10 Cyc - Am I eligible for 3 pts

EBOM-v4 WEc3:Cooling tower water use
posted by  Robert Cox  on 

Hello - Based on the water analysis provided by our vendor, we can achieve 11 cycles prior to requiring treatment. We are currently using 10 cycles. Does this qualify for 2 or 3 points?

1
Tue Aug 22, 2017, 1:09 am

100% well or non-potable water

EBOM-v4 WEc3:Cooling tower water use
posted by  Elizabeth Dunn  on 

Our building uses 100% well or non-potable water.

0

Number of cycles

EBOM-v4 WEc3:Cooling tower water use
posted by  Jonathan Miller  on 

What is the number of cycles necessary to achieve 1 point? 10?

0

100% well or non-potable water

EBOM-v4 WEc3:Cooling tower water use
posted by  Elizabeth Dunn  on 

Our building uses 100% well or non-potable water.

6
President/CEO
Envision Realty Services
LEEDuser Premium Member
2 thumbs up
Thu Nov 17, 2016, 11:56 pm

Number of cycles

EBOM-v4 WEc3:Cooling tower water use
posted by  Jonathan Miller  on 

What is the number of cycles necessary to achieve 1 point? 10?