Forum quick links
AIR TEST OPTION
NC-v4 EQc4:Indoor air quality assessmentposted by LUCY WILLIAMS on
Have any teams successfully conducted and passed the air test? Can you provide any tips on how to do so?
IAQ Testing
NC-v4 EQc4:Indoor air quality assessmentposted by Shannon Oletic on
Following Option 2 of this credit, is it acceptable that sampling areas of the building are tested once construction has finished in that area even if construction has not finished in other parts o
Flush for Residential Multifamily several stories
NC-v4 EQc4:Indoor air quality assessmentposted by Sue Bryant on
The reference guide states that "If multiple, discrete HVAC systems operate independently, the team may flush out portions of the building as work is completed in each area served by a given system
Option 2 - Is there still a minimum sample area requirement?
NC-v4 EQc4:Indoor air quality assessmentposted by Daniel Smith on
I am quoting to provide Option 2 IAQ testing for my first V4 BD+C project.
Flush-out during occupancy.
NC-v4 EQc4:Indoor air quality assessmentposted by R.L. Bowen on
Our team is working on a CNG bus station renovation project for COTA (Central Ohio Transit Authority).
Option 1 - Flushout of Non-Occupied Spaces
NC-v4 EQc4:Indoor air quality assessmentposted by Mike Bahr on
My project is a mid-rise building with the lower 5 levels being open air parking. Is that required to be flushed, and meet humidity and temperature requirements?
Lab Methods
NC-v4 EQc4:Indoor air quality assessmentposted by Nate Maniktala on
I like using canister collection TO-15 for the simplicity, but it appears TO-17 thermal desorption is required for this credit?
NC-v4 EQc4 - Indoor air quality assessment
NC-v4 EQc4:Indoor air quality assessmentposted by Muhammad Shoaib Khan on
Greetings all,
My question is there is one new construction project G+3P+9+R Residential Building which is certifying under leed version -4
Number of floor G+9
Option 1 Bust
NC-v4 EQc4:Indoor air quality assessmentposted by Michelle Rosenberger on
Is there any recourse if you go for an Option 1 flushout and fail to meet the temp or humidity limit at any point during the duration?
Change of Filtration
NC-v4 EQc4:Indoor air quality assessmentposted by Michelle Rosenberger on
It appears that only an Option 1, Path 1 flushout actually needs to install new filtration media before beginning the process. Why would that not apply to Option 1, Path 2?