Forum quick links
Temporary Materials - Formwork
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Christopher Drew on
The materials credits apply to components that are permanently installed in the building.
USGBC-approved wood certification schemes
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jane Wigren on
Where can I find a list over USGBC-approved wood certification schemes? I am especially interested in those found outside of the United States.
LEED NC - v4 MRc3 Wood products
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Sandra Closson on
The language of NC v4 does not specifically call out new wood. "Wood products must be certified by the Forest Stewardship Council or USGBC-approved equivalent.
EPR Example
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jenelle Shapiro on
Does anyone have an example of compliant EPR documentation?
Material reuse calculation
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jen Roberts on
The second example on pg 536 of the reference guide is a bit confusing.
Example of a populated BPDO calculator with all tabs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jaspreet Pahwa on
Project Location: United States Trying to determine for EPD tab within BPDO calculator, if the bottom-line of Weighted EPD value needs to be 20 or as long as 20 products from 5 manufacturer's are
SFI vs FSC
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Leanne Conrad on
Does anyone know if GBCI will accept a Sustainable Forestry Initiative certified sourcing label instead of FSC?
Wool/Biobased material
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Peter Harenda on
I am trying to clarify if 100% wool design felt would classify as a bio-based material for option 2. The portion on skin is where the question arises. Thank you.
CSRs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by NESLIHAN AKSOY on
These reports are very wide range ...but the credit is dealing with sources of raw material extraction.....?
BPDO Calculator Error
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Michael Wahjudi on
Hi all, anybody having issue with the BPDO calculator? Since we have used for our projects and the data are misplaced under different sheets.