Is there a limit to how many products can use the same CSR?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Alexa Stone  on 

An industry-wide (generic) EPD can be used for up to 10 products listed within the industry-wide EPD, provided that each application has separately reported impacts within the EPD.

1
Fri Jun 9, 2017, 11:00 am

what all is included in material cost

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Brianna Brandsen  on 

Is labor to deliver (i.e. drive time, time to unload materials, and / or shipping costs from suppliers) and / or unload materials on a job site included in the material cost?

1
Mon Aug 15, 2016, 9:30 pm

FSC calculations - weight or volume?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Julie Hardy  on 

Good afternoon everyone, We are wondering if the FSC contribution should be calculated, as in LEED 2009, by volume or weight for products.

1
Mon Aug 28, 2017, 2:38 pm

Conveying systems now accepted for this credit

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Paula Melton  on 

A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who

0

CSR following UN Global Compact

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Ana García  on 

Hello! U.N. Global Compact - Communication of Progress is a LEED compliant CSR frameworks.

1
Wed Nov 11, 2015, 4:20 pm

Scrap as regional material

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Michela Tedeschi  on 

Hi everyone. Could a scrap of a production process be claimed as regional material, assuming that it is generated and harvested in the same plant (which is, of course less the 160 km from project s

1
Wed Dec 14, 2016, 12:33 am

B-Corp Certification

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Michelle DiPenti  on 

Does anyone know if USGBC will accept the B-Corp Certification for Option 1? Thank you!

1
Tue Jun 2, 2015, 8:02 pm

How does the new 30% structure/enclosure rule work?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Jon Clifford  on 

In LEEDv4, Options 2 of MRc2 & MRc3 and Option 3 of MRc4 all include a rule that "Structure and enclosure materials may not constitute more than 30% of the value of compliant building products.

1
Mon Feb 10, 2014, 9:42 am

Temporary Materials - Formwork

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Christopher Drew  on 

The materials credits apply to components that are permanently installed in the building.

1
Wed Aug 19, 2015, 12:18 pm