How to model process chilled water load?
NC-v4 EAp2:Minimum energy performanceposted by Eric Dixon on
My proposed design for lab utilizes a heat recovery chiller connected to geo-exchange. There is a 40 ton process chilled water load on the heat recovery chiller.
U value compliance for Revolving Doors
NC-v4 EAp2:Minimum energy performanceposted by Alokmay Behera on
I am working on a LEED project with revolving doors. The targetted U value for glaze is 1.9 W/Sqft.K (including frames), SHGC 0.25.
District cold storage project
NC-v4 EAp2:Minimum energy performanceposted by Ryan Wang on
Hi all experts,
GHG Emission parameters
NC-v4 EAp2:Minimum energy performanceposted by A&L SUSTENTABILIDADE on
I have some questions regarding greenhouse gas (GHG) emissions for LEED V4 and V4.1 certification.
Baseline system type for project that will retain part of an existing HVAC system
NC-v4 EAp2:Minimum energy performanceposted by Camilo Velez on
Hi all,
Outdoor air in the Baseline Model
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi , I am working on a lab space with 100% OA , for these spaces Cooling load is driving airflow, now the OA that we calculated for Proposed case is not sufficient to maintain the setpoint in the s
Kitchen Baseline System
NC-v4 EAp2:Minimum energy performanceposted by Saif Abdulameer on
I am working on a hotel where system 6 is the baseline for the podium, one of the spaces is a kitchen served by a single zone VAV 100% outdoor air unit.
getting hot water from CHP, but not the power. Can I still get the credit of the power produced?
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
Hi! My project is getting hot water from the central combined heat and power plant in the campus, but it's NOT getting the electricity from it.
Designing Baseline with Natural Ventilation using IDA-ICE
NC-v4 EAp2:Minimum energy performanceposted by Azra on
Hi,
Industrial or non-regular process load
NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
For a facilities with increased process load (more than 60%), other than data centers, including but not limited to industrial facilities, is there a particular guidance in establishing a baseline