Natural Ventilation Savings
NC-v4 EAp2:Minimum energy performanceposted by Marcus Sheffer on
I may have helped you, now its your turn to help us all. The USGBC is seeking input and information related to the modeling of naturally ventilated and naturally conditioned buildings.
Entering nonregularrly occuoied spaces in IEQp1 calculator
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings, In the IEQp1 calculation form, provided by USGBC for using in LEED v4, in the Occupancy Category pull-down menu, there is nothing related to equipment rooms, non-occupied stores and sim
Minimum Unloading Ratio for baseline
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
For chillers in EnergyPlus I have to provide the data “Minimum Unloading Ratio”.
Account for local and utility central energy plants
NC-v4 EAp2:Minimum energy performanceposted by S. Sachs on
We are building an addition to an existing building that has a central plant that is outside of our LEED boundary. However, we also have a contract to improve the performance of the central plant.
DES Option 1 - Baseline System
NC-v4 EAp2:Minimum energy performanceposted by Jay patel on
I am modeling a new building(Laboratory/office) on a university campus following LEED v4 Option 1, Whole Building Energy Simulation. New Building is 3 story and 69,500 sq.ft .
District Energy Treatment in LEEDv4
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
Is there any new guidance or published changes for modeling district energy loops in LEED v4?
Thank you USGBC for Energy Performance Calculator
NC-v4 EAp2:Minimum energy performanceposted by Jean Marais on
Thank you USGBC for Energy Performance Calculator. I remember the days before...where you had to make your own more or less whilst fumbling through projects.
Data Center Baseline HVAC System
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Hi Markus, Thanks for your reply. I've been trying to undestand the explanation of 90.1-2013 User's Manual, page G-35.
Industrial facility in ASHRAE 90.1 2010
NC-v4 EAp2:Minimum energy performanceposted by Richard Bartlett on
We are designing a research and development facility for an equipment manufacturer and trying to pursue LEED certification for the facility.
Manufacturing process
NC-v4 EAp2:Minimum energy performanceposted by ignacio furniés on
My question is regarding the EAp2 and EAc3, our project consists of a palm oil manufacturing facility.