Thank you USGBC for Energy Performance Calculator

NC-v4 EAp2:Minimum energy performance
posted by  Jean Marais  on 

Thank you USGBC for Energy Performance Calculator. I remember the days before...where you had to make your own more or less whilst fumbling through projects.

0

Elementary School

NC-v4 EAp2:Minimum energy performance
posted by  K Nakamura  on 

Is there any special considerations for a project registered (v2.2) and designed 10 years ago is now being constructed. V2.2 and v2009 have expired so we need to register it for v4.

1
Wed Mar 15, 2017, 1:25 pm

Third Party Review v4?

NC-v4 EAp2:Minimum energy performance
posted by  SBS Department  on 

Does anyone know if either prereq EA - Minimum Energy Performance, or the Optimize Energy Performance credit need a third party review as it did under the CaGBC's LEED 2009?

1
Tue Jan 6, 2015, 3:01 pm

Manufacturing process

NC-v4 EAp2:Minimum energy performance
posted by  ignacio furniés  on 

My question is regarding the EAp2 and EAc3, our project consists of a palm oil manufacturing facility.

1
Tue Aug 9, 2016, 1:56 pm

Sea Water Cooled Chiller Modeling

NC-v4 EAp2:Minimum energy performance
posted by  Sefa Sahin  on 

Dear All, Our project building is located in Istanbul/Turkey. Cooling will be provided by centralised two chillers. There is not a cooling tower.

1
Wed Apr 26, 2017, 1:45 pm

Baseline system selection

NC-v4 EAp2:Minimum energy performance
posted by  Gaston Michaud  on 

Hello everyone, We are working with a building that has a complicated geometry, and the selection of the baseline system is not that evident.

1
Fri Jul 28, 2017, 4:13 pm

Minimum Energy Performance Calculator - Receptacle Equipment

NC-v4 EAp2:Minimum energy performance
posted by  Mark Zoeteman  on 

Minimum Energy Performance Calculator on process loads tab under receptacle equipment modeling methods paragraph indicates there are three options to model receptacle equipment: average equipment p

1
Wed Apr 1, 2015, 11:40 pm

Fresh Air & R-Values

NC-v4 EAp2:Minimum energy performance
posted by  Muzammal Abbas  on 

Dear All, I want to know that is it mandatory in LEED that we must have a fresh air in each occupied spaces of a project OR we can comply just by providing overall fresh air of the project accordi

1
Tue May 3, 2016, 12:49 pm

Tri-gen

NC-v4 EAp2:Minimum energy performance
posted by  Victoria Watson  on 

Hi, I am QA'ing a model for a building that will be fed via a cogeneration plant (with absorption chillers) and therefore is a little complicated.

1
Mon Oct 31, 2016, 7:30 pm

Proposed Case-Process Load

NC-v4 EAp2:Minimum energy performance
posted by  Muzammal Abbas LEED AP (BD+C)  on 

Hi, Is there any limitations in LEED V4 regarding process energy that it should be minimum 25% (In proposed case) of the baseline energy cost for the building.

1
Wed May 24, 2017, 4:24 pm