Cooling tower water use
Filter by location
Forum
Topic
Replies
Recent

No cooling tower - District cooling

NC-v4 WEc3:Cooling tower water use
posted by  Martina Salonen  on 

Hello! We have project which would be applicable for the 'no cooling tower' alternative compliance credit. However, the client is now considering connection to the district cooling system.

2
Sustainability Specialist
Gensler
LEEDuser Basic Member
66 thumbs up
Tue Oct 31, 2017, 8:56 am

Which parameters of the cooling tower?

NC-v4 WEc3:Cooling tower water use
posted by  Jade Deltour  on 

Which parameters/performances of the cooling tower need to be checked/optimised to limit tower cycles to avoid exceeding maximum values?

0
1
Tue Aug 29, 2017, 3:12 pm

Is there a timeframe for the minimum number of cycles?

NC-v4 WEc3:Cooling tower water use
posted by  Gregory Martin  on 

I am working on a presentation to educate my office on Lv4. This being a new credit I don't think I am totally understanding the requirements.

0

Campus Cooling Tower

NC-v4 WEc3:Cooling tower water use
posted by  Brightworks Sustainability  on 

My project is not installing a cooling tower, but they will utilize the shared existing campus cooling tower.

0

No cooling tower

NC-v4 WEc3:Cooling tower water use
posted by  Maria Porter  on 

If you have no cooling tower, do you automatically get the point or you are not eligible for the credit?

0

Dry cooling tower

NC-v4 WEc3:Cooling tower water use
posted by  Sara Johansson  on 

Hi, If a project has dry cooling, a type of cooling tower, can it than get this point?

1
Thu Jan 11, 2018, 9:13 pm

Maximum Number of Cycles

NC-v4 WEc3:Cooling tower water use
posted by  Apoorv Goyal  on 

Hi, based on a water test report, if the number of cycles already exceed 10, does that mean that both points are achievable?

1
Thu Jan 11, 2018, 9:24 pm