Post a question or comment
Credit Filters
Must be in a permanent location on existing land
Filter by location
Forum
Topic
Replies
Recent

Change Certification level after Preliminary Design & Construction review

CS-v4 MPR1:Must be in a permanent location on existing land
posted by  Ronnel Flores  on 

Is it allowable that for Preliminary Design & Construction (D&C) submission, the project attempt for example, Silver rating.

1
Fri May 15, 2020, 7:22 pm

LEED C&S (sans C?)

CS-v4 MPR1:Must be in a permanent location on existing land
posted by  Thomas Gibbons  on 

Hi folks,

Have a question that I believe relates to Interpretation #10102 and incomplete spaces (though I’m open to suggestions if I’m off-base). 

0
3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jan 12, 2018, 1:39 am

Documents Required For pre-certification for LEED V4 Core Shell

CS-v4 MPR1:Must be in a permanent location on existing land
posted by  Aqrab Ali Rana  on 

I have project of apartment in Pakistan, What are documents required for all credits actually??Do I have to submit all documents as I submit for preliminary review or just to tell the strategies an

1
Fri Nov 4, 2016, 3:25 pm