VRF HVAC Compliance
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Ben Thompson on
We are using a VRF HVAC System at a PK-8 School in Alexandria.
ASHRAE Standard vs ANSI Standard
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Ema S on
Do we need to comply with either the ASHRAE Standard vs the ANSI Standard to meet the Prerequisite???? And if so, who is usually the party responsible for documenting the compliance.....it seems th
Ceiling Clouds
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Eri Spaulding on
We have a music room with some hanging ceiling clouds that contain acoustical ceiling tiles with a high NRC (.90). Can we count the cloud areas twice?
Discrepancy between forms
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Maura Adams on
For reasons I don't need to get into here, we started off using the LEED for School Beta form (version 0.2.3) but had to switch to Version 4.0.
ANSI 12.60-2002
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by M Carolina Weitzman on
HELP!!! Where do I find 2002 version of this ansi standard? I can't locate anywhere!
Template issues for Option 1
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by renee jimenez on
Per the LEED reference guide it states that for Option 1 we are to “Confirm that 100% of all ceiling areas (excluding lights, diffusers and grilles) in all classrooms and core learning spaces are f
Submit in Design review but include manuf. cuts in Const Review
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Renee Shirey on
The prereq requires manufacturer cut sheets for the accoustic materials.
Simplified Approach
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Jean Marais on
I have a kindergarten, 7440sf, ground level only, all learning spaces are on perimeter with windows. There is only a small road on the one side about 20 m away.
Mechanical Equipment - Alternative compliance path
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Marcio Alberto Casado Pereira on
We are currently working on a project wich the HVAC system selected was the split highwall, and there are 3 evaporation machines inside each classroom.
Pre K and K school question
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Sara Sweeney on
I had perviously contacted GBCI regarding which rating system to use for this project, back in Summer 2010, which is a small Early Childhood Learning Center for 4 and 5 year olds and was told to us