Forum quick links
Pre-rinse spray valves
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Kelly Beisswanger on
Trying to figure out if I need to and how/where to include values for pre-rinse spray valve use.
Availability of 2/4 LPF WCs
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Maya Karkour on
Dear all, A Contractor of a LEED project has been struggling to find dual flush 2/4 LPF WCs in Lebanon (the Middle East). Can someone please provide me with a list of suppliers who readily have 2
10 second flow rate
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Lauren Sparandara on
I received the final comment for one of my LEED for Schools projects: "Metered faucet duration has not been revised from 10-second duration to the default 12-second duration as required.
Adjustable valve for WC fixtures
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Maya Karkour on
Dear all, The project has 2/4 LPF WC fixtures specified, and the water calculations done accordingly. The Contractor is suggesting a WC fixture with a maximum flush rate of 3/6 LPF, but with a reg
It is mentioned that well and
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Ameet AA on
It is mentioned that well and pond water does not count for this credit. extracting water from onsite Aquifer using borehole can considered for this credit as the project will not be using any pota
Trouble meeting prerequisite in school!
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Gail Vittori on
We are working with a school that is struggling to meet the prerequisite given programming and district requirements.
Residential Type Sinks in Middle School Classroom
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Sara Zoumbaris on
Hi, We are working on a middle school that has 2, Home Economics classrooms with residential kitchen-style fixtures; I would assume these should be included within my calculation?
Pre-Rinse Spray Valve Before 11/1/2011 addenda
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Crina Bosch on
Above states "If your project is registered after the 11/1/2011 addenda release then the pre-rinse spray valve flow rate must be 1.6 gpm or less in order to comply with the prerequisite.
Default Fixture use for a School Project (shower)
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Markus Henning on
I am working on a school project and actualy calculating WEp1. I am wondering that the default fixture use for a school indicate no daly uses for a shower for students.
school example in documentation toolkit?
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by William Weaver on
I was wondering if the LEEDuser team could provide an example of a completed template for a school project in the documentation toolkit.