CS-2009 IEQp1:Minimum IAQ Performanceposted by John Covello on
Hello, We have a client who is designing a C&S factory. They are not sure who the tenant will be other than a factory space.
Background Ventilation
CS-2009 IEQp1:Minimum IAQ Performanceposted by Patrice McVeigh on
Hi Everybody, ASHRAE 62.1 currently outlines a minimum ventilation rate for all room types, regularly occupied or not (i.e.
Grouping of spaces
CS-2009 IEQp1:Minimum IAQ Performanceposted by Anupam Jain on
I am working on a project with similar spaces repeating on each floor. I know LEED allows one to group spaces in some credits.
Addenda to ASHRAE standards
CS-2009 IEQp1:Minimum IAQ Performanceposted by Jens Apel on
Edit: question has already been answered in February 2012 here: http://www.leeduser.com/credit/CI-2009/EAp2 Didn't find it before, sorry for any confusion. Dear all, on several spots in the Ref Gu
Tenant work and submittal of credits
CS-2009 IEQp1:Minimum IAQ Performanceposted by Lise Dannesboe on
I am currently working on a Core & Shell project, which is a major renovation, aiming at LEED SILVER.
Naturally ventilated spaces
CS-2009 IEQp1:Minimum IAQ Performanceposted by Nader NAKIB on
I appreciate your interpretations on the ASHRAE 62.1 regarding the requirement for naturally ventilated spaces: 5.1.1 Location and Size of Openings: Naturally ventilated spaces shall be permanentl
exhaust rate - garages
CS-2009 IEQp1:Minimum IAQ Performanceposted by Agnieszka Rylska on
ASHRAE 62.1-2007 requires specific exhaust rates for different space types in Table 6-4. For parking garages the requirement is 3.7 L/s/m2.
Ventilation strategy for rooms added after construction work
CS-2009 IEQp1:Minimum IAQ Performanceposted by Ricardo Sá on
An office building that is being certified under LEED C&S will have 80% of its gross floor area without a complete interior fit-out at time of construction work completion.
Two buildings on one project site
CS-2009 IEQp1:Minimum IAQ Performanceposted by James Lee on
Hi, I am James and am working on project with two buildings on one project site. In this case, should I fill out IEQp1 form separately like EAp2? Maybe someone already asked this question. But p
Project size increase
CS-2009 IEQp1:Minimum IAQ Performanceposted by Silvia Ruiz on
Dear all In a project that we are certificating LEED C&S v3 the owner has modified the OPRs, specificly the project size and the MEP system. 1.