CS-2009 IEQp1:Minimum IAQ Performanceposted by Lise Dannesboe on
I am currently working on a Core & Shell project, which is a major renovation, aiming at LEED SILVER.
Naturally ventilated spaces
CS-2009 IEQp1:Minimum IAQ Performanceposted by Nader NAKIB on
I appreciate your interpretations on the ASHRAE 62.1 regarding the requirement for naturally ventilated spaces: 5.1.1 Location and Size of Openings: Naturally ventilated spaces shall be permanentl
exhaust rate - garages
CS-2009 IEQp1:Minimum IAQ Performanceposted by Agnieszka Rylska on
ASHRAE 62.1-2007 requires specific exhaust rates for different space types in Table 6-4. For parking garages the requirement is 3.7 L/s/m2.
Ventilation strategy for rooms added after construction work
CS-2009 IEQp1:Minimum IAQ Performanceposted by Ricardo Sá on
An office building that is being certified under LEED C&S will have 80% of its gross floor area without a complete interior fit-out at time of construction work completion.
Two buildings on one project site
CS-2009 IEQp1:Minimum IAQ Performanceposted by James Lee on
Hi, I am James and am working on project with two buildings on one project site. In this case, should I fill out IEQp1 form separately like EAp2? Maybe someone already asked this question. But p
Growth and Erosion
CS-2009 IEQp1:Minimum IAQ Performanceposted by Adriana Hansen on
We have an HVAC system configured with ceiling plenum return. Is this plenum required to meet item (§ 5.5.1) Resistance to Mold Growth and (§ 5.5.2) Resistance to Erosion of ASHRAE 62.1?
Zone Air Distribution Effectiveness
CS-2009 IEQp1:Minimum IAQ Performanceposted by Noriko Nagazumi on
Let me confirm the following ASHRAE 62.1-2007 Zone Air Distribution Effectiveness (Ez) issue. Our project utilizes total heat exchangers for ventilation.
Occupant Density - Filling out the IEQp1 form
CS-2009 IEQp1:Minimum IAQ Performanceposted by Ron Dean on
Hello, I have two specific questions, please help me working them out. 1.
Recilculation Class Air
CS-2009 IEQp1:Minimum IAQ Performanceposted by Luis Miguel Diazgranados on
Hi everybody, I am working in an office building project, core and Shell scope.
n/a
CS-2009 IEQp1:Minimum IAQ Performanceposted by Alan Viale on
Dear all, We are working on a mall with natural ventilation on the common areas (corridors).