Shell with no energy or metering systems
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Martin Meehan on
Hello
My project is to be a shell with no HVAC, lighting or metering systems. It is understood that there will be one tenant for the building.
applying only for EAc5.2 not EAc5.1
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Anna Bak on
Hi! Do you know if we can apply for EAc5.2 without applying for EAc5.1? The Investor doesn't want to pay for the model callibration, therefore we will not apply for EAc5.1.
Leasable areas fed by the utility
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Ricardo Sá on
An office building is being certified under LEED C&S. All leasable areas will be fed directly by the utility.
EA Credit 5.2: Tenant Submetering - Electricity
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Ian McCall on
Hello all, I am working on a large Core and Shell project composed of office spaces and commercial centre (in France). The commercial centre is 5 stories high and occupied by one single tenant.
Tenants Obliged to Share Data with USGBC?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Ian McCall on
Hello All, Are tenants obliged to share their energy data with USGBC for any period of time?
Process for corrective action
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Maya Karkour on
Hello, One of the requirements of EA Credit 5.2 is to "provide a process for corrective action if the results of the M&V plan indicate that energy savings are not being achieved".
Must be electricity for FCUs ventilators measured?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Frantisek Macholda on
Hello, we have CS office project. The main HVAC systems are central, there are only fan-coils and small local water heaters in tenant spaces.
Tenant Sub-metering Question
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Lorey Flick on
What is a typical "centrally monitored" system? I have a core and shell space that will be providing sub-metering for it's tenant and a monthly bill indicating usage, peak, and cost.
M&V Plan
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Akshay Odugoudar on
Does the M&V Plan for EAc5.2 have to include what tool is being used to calculate the baseline energy use of the building?
Co-working space
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Gustavo De las Heras Izquierdo on
Hallo, My project is a co-working space for multiple companies. The tenants won't be assigned a fixed space to work in, and there are common spaces where anyone can sit down and work.