Forum quick links
EAc 5.1 for LEED C&S
CS-2009 EAc5.1:Measurement and verification - base buildingposted by S Nagarajan on
Dear Sir I am involved in a 5-storey building. The base building loads are mixed loads, i.e the loads include lighting and small power.
Energy Model Calibration by Post Construction data
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Gabriela Hernández Castillo on
Our Project is applying for M&V plan option D method 2, which let us calibrate the energy model with post construction measures.
Sub Metering of Service Hot Water (Domestic Hot Water)
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Ciaran McCabe on
Does Service hot water need to be sub-metered to satisfy this credit ? If not will it make the energy model more difficult to calibrate.
Tenant Submetering connected to BMS?
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Marco Abdallah on
We are pursueing 5.1 Opt. 1 and 5.2 at a CS-project with 10 floors leasable to different tenants.
Separating lighting metering from plug load metering.
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Rudolph Carneiro on
I have seen many comments in this forum stating that plug loads should be metered seperately from lighting loads. I'm not sure if seperating these loads is actually necessary.
Model Calibration - Margins for Error
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Ciaran McCabe on
For a new office building would it be acceptable to use these error margins for an M&V Report.
EA Credit 5.1: Base Building Sub-metering
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Ian McCall on
Hello all, I am working on a large Core and Sheel project composed of office spaces and commercial centre (in France). The comercial centre is 5 stories high and occupied by one single tenant.
List energy end uses
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Mike D on
"The M and V Plan omits the table or listing of the project’s energy end uses as required by the form." However, the Plan we have submitted lists the following: Locations and types of energy meter
M&V period for LEED 2009 C&S projects for EAc5.1 + EAc5.2
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Philip Herriges on
The LEED reference guide is very particular in the language that they use to describe the intent and stragegies for EAc5.1 and 5.2 for C&S as being distinct from NC & Schools. For NC&