CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Hi, I have 2 questions in relation to the 90.1 Energy Model. 1) Is Dublin (Ireland) in ASHRAE climate zone 5 or 5a. 2) The building to be modeled is a 5 storey building with a basement.
Baseline Construction Performance
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
When modelling the Baseline where the building is existing (not a new build) what is the procedure for selecting the baseline constructions in the model. This building is outside the US.
How does the formula work with mixed new and existing projects?
CS-2009 EAc1:Optimize Energy Performanceposted by Charles Nepps on
Our project building is 75% existing and 25% new construction. When the credit form calculates the EAc1 points, it is done based on a weighted average, which makes sense.
LEED CS 2009 EAc1
CS-2009 EAc1:Optimize Energy Performanceposted by Ruel Galve on
We are currently doing a LEED 2009 CS - GOLD project in Jakarta. The question is: Do we need to select our equipment (pumps and fans) based on the recommended baseline building design power from A
HVAC Systems Selection for Baseline
CS-2009 EAc1:Optimize Energy Performanceposted by Mark Stromberg on
My question is regarding the following procedure as outlined in Trace 700 help: "To determine which ASHRAE baseline system to model, refer to ASHRAE Standard 90.1-2007, Table G3.1.1A (below).
TABLE 6.5.3.1.1B Fan Power Limitation Pressure Drop Adjustment
CS-2009 EAc1:Optimize Energy Performanceposted by Mark Stromberg on
I would like some help on the intent and definition with some examples that can use 0.5 in. w.c. as credit for: "Return and/or exhaust airflow control devices". Thanks
LEED Silver with EAp2 only?
CS-2009 EAc1:Optimize Energy Performanceposted by Matt Humphreys on
Is it possible for a project to achieve LEED Silver and only meet EAp2 by demonstrating 10% energy cost savings?
Future space
CS-2009 EAc1:Optimize Energy Performanceposted by Jatuwat Varodompun on
In case of project with an area which is already designed but yet built (less than 40% of gross project area), can we use "owner's commitment" instead of "leasing agreement" to state all the design
Clarification on C&S and MEP Systems
CS-2009 EAc1:Optimize Energy Performanceposted by Emmanuel Gee on
Hello, This is our first Core & Shell project and we have a tenant ready for a two story commercial space.
Incorporation of Modulating Exhaust Fan in Model
CS-2009 EAc1:Optimize Energy Performanceposted by Brian Salazar on
Hello again! Our project is in the final throws of appeal and we have been able to secure EAp2 and 4 points for energy efficiency.