external lighting LPD contribution to percentage energy savings
CS-2009 EAc1:Optimize Energy Performanceposted by Puteri Shireen Jahnkassim on
Hello there What does this mean : Ensure that no credit is taken in the proposed case for lighting reduction on tradable surfaces" Does this mean if the LPD for facade lighting for a designed b
Night-Setback also in Baseline?
CS-2009 EAc1:Optimize Energy Performanceposted by Marco Abdallah on
THE BMS in our project is programmed with a night-setback function to reduce the temperature at NO operation (night) in winter for energy saving purpose. As the temperature setpoints have to be mod
Tenant Area HVAC System
CS-2009 EAc1:Optimize Energy Performanceposted by Nidhi Khanna on
Hi, I am working on a mixed use project with retail on 1st floor and office on 2nd and 3rd floor with a total project area of 115,000 sf.
Common Area Spaces/Tenant Fit Out
CS-2009 EAc1:Optimize Energy Performanceposted by Heather South on
I am working on a Core & Shell LEED 2009 project and am wondering if for the energy simulation model on the proposed building versus the baseline, should we only include the shared common space
Tenant area-HVAC system type
CS-2009 EAc1:Optimize Energy Performanceposted by Amgad Khattab on
We are modeling a Core & Shell office building where the HVAC system is in the tenant scope. we are only delivering chilled water and outdoor air to the tenant areas.
ASHRAE 90.1 Add G table G3.1 baseline
CS-2009 EAc1:Optimize Energy Performanceposted by charles bell on
We have a building which is six stories. The first floor is retail, second thru fifth is office and sixth is residential. All are served from a virtual central plant.
Power Adjustment Percentages for Automatic Lighting Controls
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Hi, I am producing an energy model for a a refurbished building with a new lighting scheme. The installed LPD is 9 Watts /m2 using LED.
"Categorized as an Office Space"
CS-2009 EAc1:Optimize Energy Performanceposted by Aaron Frantz on
We are proposing a new mixed use multi-story to be submitted under NC, v2009. The first floor will be cold dark shell space for future retail/restaurant tenants.
Can a shell be LEED Core and Shell certified without HVAC?
CS-2009 EAc1:Optimize Energy Performanceposted by Lawrence Lile on
I've cross posted this in the LEED CS fundamental commissioning discussion since these two issues seem to be the showstoppers. We are working on a project that is a tenant finish-out shell.
MPR, GFA and energy modelling
CS-2009 EAc1:Optimize Energy Performanceposted by Puteri Shireen Jahnkassim on
Dear All, In the LEED MPR, it states that carpark areas cannot be part of the calculated GFA of a project submitting for LEED.