Outdoor Air Ventilation Rates to be Modeled
CS-2009 EAp2:Minimum energy performanceposted by Ned Halling on
It is not clear to me how to model the "minimum outdoor air ventilation rates".
ACP / developer control percentage penalizes existing buildings?
CS-2009 EAp2:Minimum energy performanceposted by Jareb Ketay on
I've done a number of Core and Shell models before, and always use the ACP calculator.
Zone adjust in residential project
CS-2009 EAp2:Minimum energy performanceposted by Panupant Phapant on
We have an apartment building project. In 1 dwelling unit has 1 bedroom 1 living unit and restroom. Do I need to separate between bedroom and living quarter ?
great
CS-2009 EAp2:Minimum energy performanceposted by Mary Wilkerson on
nice thread. very interesting.
outdoor air rate in area where uses demand control strategy
CS-2009 EAp2:Minimum energy performanceposted by tiantian zhou on
Dear sir, in our project,the meeting room uses CO2 sensor to control the outdoor rate and the parking garage uses CO sensor to control the outdoor rate.
Will "representative modelling" meet prerequisite/ASHRAE reqs?
CS-2009 EAp2:Minimum energy performanceposted by Ward Miller on
The project at hand is ~500,000 sf and contains 4 buildings, each with 2 sub-floors, a ground floor, and between 4 and 11 stories and a district heating source.
Modeling OA with Demand control ventilation
CS-2009 EAp2:Minimum energy performanceposted by Indochine Engineering VN on
Hi, I have demand control ventilation for every AHU.
compliance with ASHRAE 90.1 2007
CS-2009 EAp2:Minimum energy performanceposted by shashank jain on
In order to fulfil the requirements of EAp2 through building simulation, do we need to meet mandatory requirements of ASHRAE 90.1 2007.
VAV boxes
CS-2009 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.
ENERGY MODELING
CS-2009 EAp2:Minimum energy performanceposted by RICARDO GUEMEZ DIAZ on
Hello, In Mexico City we have a one project that is integrated in two phases, the phase one start the construction phase in 2011 and the second phase will start the construction phase the next year